Paper Title Page
THPLT140 Commissioning of BL 7.2, the New Diagnostic Beamline at the ALS 2780
 
  • F. Sannibale, D. Baum, A. Biocca, N. Kelez, T. Nishimura, T. Scarvie, E. Williams
    LBNL, Berkeley, California
  • K. Holldack
    BESSY GmbH, Berlin
 
  BL 7.2 is a new beamline at the Advanced Light Source (ALS) dedicated to electron beam diagnostics. The system, which is basically a hard x-ray pinhole camera, was installed on the storage ring in August 2003 and the commissioning with the ALS electron beam followed immediately after. In this paper, the commissioning results are presented together with the description of the relevant measurements performed for the beamline characterization.  
THPLT141 Operational Experience Integrating Slow and Fast Orbit Feedbacks at the ALS 2783
 
  • C. Steier, E.E. Domning, T. Scarvie, E. Williams
    LBNL, Berkeley, California
 
  A fast global orbit feedback system has been implemented at the ALS and is being used during user operation since this year. The system has two main purposes. The first is to meet the demands of some users for even improved (submicron) short term orbit stability. The second is to enable the use of more sophisticated insertion device compensation schemes (e.g. tune, beta-beating, coupling) for fast moving insertion devices like elliptically polarizing undulators, without deteriorating the orbit stability. The experience of routine user operation with the fast orbit feedback will be presented, as well as the overall feedback performance and how the integration issues with the already existing slow orbit feedback were solved.  
THOACH01 SPEAR3 Commissioning 216
 
  • J.A. Safranek, S. Allison, P. Bellomo, W.J. Corbett, M. Cornacchia, E. Guerra, R.O. Hettel, D. Keeley, N. Kurita, D.J. Martin, P.A. McIntosh, H. Morales, G.J. Portmann, F.S. Rafael, H. Rarback, J.J. Sebek, T. Straumann, A. Terebilo, J. Wachter, C. Wermelskirchen, M. Widmeyer, R. Yotam
    SLAC/SSRL, Menlo Park, California
  • M.J. Boland, Y.E. Tan
    ASP, Melbourne
  • J.M. Byrd, D. Robin, T. Scarvie, C. Steier
    LBNL/ALS, Berkeley, California
  • M. Böge
    PSI, Villigen
  • H.-P. Chang, C.-C. Kuo, H.-J. Tsai
    NSRRC, Hsinchu
  • W. Decking
    DESY, Hamburg
  • M.G. Fedurin, P. Jines
    LSU/CAMD, Baton Rouge, Louisiana
  • K. Harkay, V. Sajaev
    ANL/APS, Argonne, Illinois
  • S. Krinsky, B. Podobedov
    BNL/NSLS, Upton, Long Island, New York
  • L.S. Nadolski
    SOLEIL, Gif-sur-Yvette
  • A. Ropert
    ESRF, Grenoble
  • M. Yoon
    POSTECH, Pohang, Kyungbuk
 
  Starting in April, 2003, the SPEAR2 storage ring was removed and replaced with a new 500 mA, 3 GeV light source, SPEAR3. The SPEAR2 storage ring had been in use for high energy physics, then synchrotron radiation since 1972. Commissioning of SPEAR3 started on December 8, 2003 and synchrotron radiation will be delivered to the first users on March 8, 2004. SPEAR3 commissioning will be reviewed, including discussion of diagnostics, orbit control, optics correction and high current studies.  
Video of talk
Transparencies