A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Roseberry, T.

Paper Title Page
WEPLT172 Design & Handling of High Activity Collimators &Ring Components on the SNS 2230
 
  • G.R. Murdoch, D. Crisp, S. Henderson, M. Holding, K. Potter, T. Roseberry
    ORNL/SNS, Oak Ridge, Tennessee
 
  Design & Handling of High Activity Collimators on the SNS*G Murdoch,S Henderson, K Potter,T Roseberry,Oak Ridge National Laboratory, USA,H Ludewig, N Simos, Brookhaven National Laboratory, USAJ Hirst, Rutherford Appleton Laboratory,UK, The Spallation Neutron Source accelerator systems will provide a 1GeV, 1.44MW proton beam to a liquid mercury target for neutron production. The expected highest doses to components are in the collimator regions. This paper presents the mechanical engineering design of a typical collimator highlighting the design features incorporated to assist with removal once it is activated. These features include shielding and lifting fixtures but more importantly a double contained flexible water system incorporating remote water couplings.Also presented is a mechanism that allows axial removal of vacuum bellows and its associated vacuum clamps.*SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos and Oak Ridge.