A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Ohkuma, H.

  
Paper Title Page
MOPKF047 Suppression of Stored Beam Oscillation Excited by Beam Injection 414
 
  • T. Ohshima, N. Kumagai, M. Masaki, S. Matsui, H. Ohkuma, K. Soutome, M. Takao, H. Tanaka
    JASRI/SPring-8, Hyogo
 
  Top-up operation is scheduled from May 2004 at SPring-8. For this operation it is important that frequent beam injections should not excite the oscillation of stored beams. However, injection bump orbit was not closed perfectly and residual beam oscillations lead to increase of effective beam sizes by twice and three times in the horizontal and vertical direction respectively. We are trying to reduce these excited oscillations to less than one third of the usual beam sizes. For the suppression of horizontal one, we applied a novel scheme to reduce the effect due to the nonlinearity of sextupole magnets by adjusting the strength ratio of the sextupoles. The field similarity of bump magnets was also improved by replacing them with newly designed ones, where the effect of eddy current at the end plates was reduced. These countermeasures suppressed the horizontal oscillation by about one order. For the suppression of vertical one, the excitation mechanism has being investigated in detail. Presently the tilt angle adjustment of bump magnets reduced the vertical oscillation by one third. For further reduction of these oscillations, corrections with pulse-magnets is under investigation.  
WEPKF039 The Vacuum System of Super SOR 1690
 
  • H. Sakai, M. Fujisawa, A. Kakizaki, T. Kinishita, H. Kudo, N. Nakamura, O. Okuda, S. Shibuya, K. Shinoe, H. Takaki
    ISSP/SRL, Chiba
  • K. Kobayashi
    KEK, Ibaraki
  • T. Koseki
    RIKEN/RARF/BPEL, Saitama
  • H. Ohkuma
    JASRI/SPring-8, Hyogo
  • S. Suzuki
    LNS, Sendai
 
  The Super-SOR light source is a Japanese VUV and soft X-ray third-generation synchrotron radiation source, which consists of 1.8GeV storage ring and injector. The beam current is circulated up to 400mA. These accelerators are designed so as to fully meet requirements for top-up injection. In order to realize these operation modes, our vacuum system are required on following conditions. One is to obtain the long lifetime. The other is not to melt the vacuum chamber by irradiating the high flux synchrotron radiation. Finally beam instability is not occurred by large wake fields. We describe the design of the vaccum chamber of Super-SOR and present the recent R&D concerning this system.  
THOACH03 Top-up Operation at SPring-8 - Towards Maximizing the Potential of a 3rd Generation Light Source 222
 
  • H. Tanaka, T. Aoki, T. Asaka, S. Daté, K. Fukami, Y. Furukawa, H. Hanaki, N. Hosoda, T. Kobayashi, N. Kumagai, M. Masaki, T. Masuda, S. Matsui, A. Mizuno, T. Nakamura, T. Nakatani, T. Noda, T. Ohata, H. Ohkuma, T. Ohshima, M. Oishi, S. Sasaki, J. Schimizu, M. Shoji, K. Soutome, M. Suzuki, S. Suzuki, S. Takano, M. Takao, T. Takashima, H. Takebe, K. Tamura, R. Tanaka, T. Taniuchi, Y. Taniuchi, K. Tsumaki, A. Yamashita, K. Yanagida, H. Yonehara, T. Yorita
    JASRI/SPring-8, Hyogo
  • M. Adachi, K. Kobayashi, M. Yoshioka
    SES, Hyogo-pref.
 
  Top-up operation maximizes research activities in a light source facility by an infinite beam lifetime and photon beam stability. We have been improving the SPring-8 accelerators to achieve the ideal top-up operation. For the perturbation-free injection, we adjusted the magnetic field shape of four bump magnets to close the bump orbit, and introduced a scheme to suppress the stored beam oscillation induced by the nonlinearlity of sextupole magnets. These reduced the horizontal oscillation down to a third of the stored beam size. For the loss-free injection, beam collimators were installed upstream of the injection line. This realized the injection efficiency of ~100% under the restricted gap condition of in-vacuum insertion devices (ID). Since autumn 2003, we have been injecting the beams keeping the photon beam shutters opened and ID gaps closed. We developed a bunch-by-bunch feedback system to reduce the beam loss further with all the ID gaps fully closed by lowering the operating chromaticity. The operation with constant stored current is scheduled in June 2004. We present the overview and progress of the SPring-8 top-up operation focusing on our developments and results.  
Video of talk
Transparencies