|
- S. Suzuki, T. Asaka, H. Dewa, H. Hanaki, T. Kobayashi, T. Masuda, A. Mizuno, T. Taniuchi, H. Tomizawa, K. Yanagida
JASRI/SPring-8, Hyogo
|
|
|
The top-up operation of the SPring-8 storage ring will start in May, 2004. In order to realize alternative injection into the booster synchrotron in the top-up operation and the NewSUBARU, an AC bending magnet replaced the DC bending magnet in the beam transport line to the booster synchrotron. This magnet operates at 1 Hz with a trapezoid current pattern. The 1-GeV electron beam goes at the bottom of the current pattern to the NewSUBARU or at the top of the pattern to the booster synchrotron. In order to obtain the higher reliability of the linac for the top-up operation, reinforcement of the beam monitor systems, further improvement of RF phase stability and upgrade of the control system were required. BPM?s has been newly installed in energy dispersion sections, and beam transport feedback control is in development. The phase variation in the RF system was reduced by the regulation of the gas pressure in the waveguide of the klystrons drive system. We re-engineered the VME systems to maximize availability of the linac operation considering its reliability, usability, expandability and flexibility.
|
|
|
- H. Tanaka, T. Aoki, T. Asaka, S. Daté, K. Fukami, Y. Furukawa, H. Hanaki, N. Hosoda, T. Kobayashi, N. Kumagai, M. Masaki, T. Masuda, S. Matsui, A. Mizuno, T. Nakamura, T. Nakatani, T. Noda, T. Ohata, H. Ohkuma, T. Ohshima, M. Oishi, S. Sasaki, J. Schimizu, M. Shoji, K. Soutome, M. Suzuki, S. Suzuki, S. Takano, M. Takao, T. Takashima, H. Takebe, K. Tamura, R. Tanaka, T. Taniuchi, Y. Taniuchi, K. Tsumaki, A. Yamashita, K. Yanagida, H. Yonehara, T. Yorita
JASRI/SPring-8, Hyogo
- M. Adachi, K. Kobayashi, M. Yoshioka
SES, Hyogo-pref.
|
|