A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Marusic, A.

Paper Title Page
TUPLT184 Operational Measurement of Coupling by Skew Quadrupole Modulation 1559
 
  • Y. Luo, P. Cameron, R. Lee, A. Marusic, F.C. Pilat, T. Roser, D. Trbojevic, J. Wei
    BNL, Upton, Long Island, New York
 
  The measurements of betatron coupling via skew quadrupole modulation is a new diagnostics technique that has been recently developed and tested at RHIC. By modulating the current of different skew quadrupole families with different frequencies and measuring the resulting eigentunes response with a high resolution phase lock loop (PLL) system, it is possible to determine the projections of the residual coupling coefficients. We report the results of extensive beam studies carried on at RHIC injection, store energy and on the ramp. The capability of measuring coupling on the ramp opens the possibility of continuous coupling corrections during acceleration.  
MOPLT165 Luminosity Increases in Gold-gold Operation in RHIC 917
 
  • W. Fischer, L. Ahrens, J. Alessi, M. Bai, D. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, J. Butler, R. Calaga, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fu, G. Ganetis, J. Glenn, T. Hayes, P. He, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R. Lee, Y. Luo, W.W. MacKay, G. Marr, A. Marusic, R. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, C. Pearson, S. Peggs, A. Pendzick, F.C. Pilat, V. Ptitsyn, T. Roser, J. Sandberg, T. Satogata, C. Schultheiss, A. Sidi-Yekhlef, L. Smart, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J. Tuozzolo, J. Van Zeijts, K. Vetter, K. Yip, A. Zaltsman, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York
 
  After an exploratory phase, during which a number of beam parameters were varied, the RHIC experiments now demand high luminosity to study heavy ion collisions in detail. Presently RHIC operates routinely above its design luminosity. In the first 4 weeks of its current operating period (Run-4) the machine has delivered more integrated luminosity that during the 14 weeks of the last gold-gold operating period (Run-2). We give an overview of the changes that increased the instantaneous luminosity and luminosity lifetime, raised the reliability, and improved the operational efficiency.