de Jong, M.S.

  
Paper Title Page
WEILH04 Industrial Involvement in the Construction of Synchrotron Light Sources 206
 
  • M.S. de Jong
    CLS, Saskatoon, Saskatchewan
 
  The design, construction and commissioning of a modern third-generation synchrotron light source facility is a major project, costing hundreds of millions of dollars. The delivery of these new facilities, usually on a fixed budget and schedule, requires an effective working relationship with all suppliers providing equipment and services to the project. This talk will examine some of the key issues in developing and maintaining such a relationship with industry during the construction of a third-generation synchrotron light facility. These issues include project planning, the contract specification, the tendering process, communication techniques over the contract term, and other aspects of contract control. Examples, primarily from our experience constructing the Canadian Light Source but also from other new facilities planned or under construction, will be used to examine the effectiveness of various approaches to working with industry.  
Video of talk
Transparencies
THPKF007 Canadian Light Source Status and Commissioning Results 2266
 
  • L. Dallin, R. Berg, J.C. Bergstrom, X. Shen, R.M. Silzer, J.M. Vogt, M.S. de Jong
    CLS, Saskatoon, Saskatchewan
 
  The storage ring for the Canadian Light Source (CLS) was completed in August 2003. By January 2004, after about shifts of commissioning beam currents of up to 25 mA with 0.7 hr lifetimes were achieved. Injection times for 25 mA are about 4 minutes. Commissioning activities include global orbit correction, measurement of machine parameters and beam-based diagnostices. Features of the CLS are a compact lattice (170 m) for a 2.9 GeV storage ring, high performance magnets and a superconducting RF cavity. By July, when beamlines become operational, currents up to 100 mA with 4 hour lifetimes are expected.