SPEAR2 was upgraded in 2003, to a new 3rd Generation Light Source (3GLS) enabling users to take better advantage of almost 100x higher brightness and flux density over its predecessor SPEAR2. As part of the upgrade, the SPEAR2 RF system has been re-vamped from its original configuration of one 200 kW klystron feeding a single 358.5 MHz, 5-cell aluminum cavity; to a 1.2 MW klystron feeding four 476.3 MHz, HOM damped copper cavities. The system installation was completed in late November 2003 and the required accelerating voltage of 3.2 MV (800 kV/cavity) was very rapidly achieved soon after. This paper details the SPEAR3 RF system configuration and its new operating requirements, highlighting its installation and subsequent successful operation.
|
|
THOACH01 |
SPEAR3 Commissioning
|
216 |
|
- J.A. Safranek, S. Allison, P. Bellomo, W.J. Corbett, M. Cornacchia, E. Guerra, R.O. Hettel, D. Keeley, N. Kurita, D.J. Martin, P.A. McIntosh, H. Morales, G.J. Portmann, F.S. Rafael, H. Rarback, J.J. Sebek, T. Straumann, A. Terebilo, J. Wachter, C. Wermelskirchen, M. Widmeyer, R. Yotam
SLAC/SSRL, Menlo Park, California
- M.J. Boland, Y.E. Tan
ASP, Melbourne
- J.M. Byrd, D. Robin, T. Scarvie, C. Steier
LBNL/ALS, Berkeley, California
- M. Böge
PSI, Villigen
- H.-P. Chang, C.-C. Kuo, H.-J. Tsai
NSRRC, Hsinchu
- W. Decking
DESY, Hamburg
- M.G. Fedurin, P. Jines
LSU/CAMD, Baton Rouge, Louisiana
- K. Harkay, V. Sajaev
ANL/APS, Argonne, Illinois
- S. Krinsky, B. Podobedov
BNL/NSLS, Upton, Long Island, New York
- L.S. Nadolski
SOLEIL, Gif-sur-Yvette
- A. Ropert
ESRF, Grenoble
- M. Yoon
POSTECH, Pohang, Kyungbuk
|
|
|
Starting in April, 2003, the SPEAR2 storage ring was removed and replaced with a new 500 mA, 3 GeV light source, SPEAR3. The SPEAR2 storage ring had been in use for high energy physics, then synchrotron radiation since 1972. Commissioning of SPEAR3 started on December 8, 2003 and synchrotron radiation will be delivered to the first users on March 8, 2004. SPEAR3 commissioning will be reviewed, including discussion of diagnostics, orbit control, optics correction and high current studies.
|
|
|
Video of talk
|
|
Transparencies
|
THPKF082 |
The Completion of SPEAR 3
|
2448 |
|
- R.O. Hettel, R. Akre, S. Allison, P. Bellomo, R.F. Boyce, L. Cadapan, R. Cassel, B. Choi, W.J. Corbett, D. Dell'Orco, T. Elioff, I. Evans, R. Fuller, S. Hill, D. Keeley, N. Kurita, J. Langton, G. Leyh, C. Limborg-Deprey, D. Macnair, D.J. Martin, P.A. McIntosh, E. Medvedko, C.-K. Ng, I. Nzeadibe, J. Olsen, M. Ortega, G.C. Pappas, S. Park, T. Rabedeau, H. Rarback, A. Ringwall, P. Rodriguez, J.A. Safranek, H.D. Schwarz, B. Scott, J.J. Sebek, S. Smith, T. Straumann, J. Tanabe, A. Terebilo, T.A. Trautwein, C. Wermelskirchen, M. Widmeyer, R. Yotam, K. Zuo
SLAC/SSRL, Menlo Park, California
|
|
|
On December 15, 2003, 8 1/2 months after the last electrons circulated in the old SPEAR2 storage ring and 5 days after the beginning of commissioning, the first electrons were accumulated in the completely new SPEAR3 ring. The rapid installation and commissioning is a testimony to the SPEAR3 project staff and collaborators who have built an excellent machine and equipped it with powerful and accessible machine modeling and control programs. The final year of component fabrication, system implementation and testing, the 7-month installation period leading up to the beginning of commissioning, and lessons learned are described.
|
|