TUPRI109 Construction and Commissioning of Event Timing System at SuperKEKB 1829
 
  • H. Kaji, K. Furukawa, M. Iwasaki, E. Kikutani, T. Kobayashi, F. Miyahara, T.T. Nakamura, M. Satoh, M. Suetake, M. Tobiyama
    KEK, Ibaraki, Japan
  • T. Kudo, S. Kusano
    Mitsubishi Electric System & Service Co., Ltd, Tsukuba, Japan
  • T. Okazaki
    EJIT, Hitachi, Ibaraki, Japan
 
  The Event Timing System of Injector Linac at KEK is upgraded to satisfy the new requirements for the SuperKEKB project. After finishing the design and feasibility studies*, we have constructed the new system at Main Trigger Station of Linac. The new functions are developed in this system to perform the injection control of positrons with the newly constructed damping ring. Besides, we integrate the capability to adjust the trigger timing just 20 ms before injection so that the injection RF-bucket of the ring can be decided at the last minute. Now, both the new system and the current working system are operational at Main Trigger Station. This is important for the smooth taking over of Event Timing System. Even during the construction period, Linac must be operated to provide beams into the two light source rings. In this situation, we can carry out enough tests with the actual condition. These tests do not disturb the regular operation and brush up the Event Timing System to enable the quick startup of the SuperKEKB operation. We report about the detailed configuration of the new system and its commissioning performed in the 2014 spring run period.
* H. Kaji et al., "Upgrade of Event Timing System at SuperKEKB",
proceedings of ICALEPCS13, San Francisco, USA, October 6-11, 2013.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-TUPRI109  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPME071 Development and Construction Status of New LLRF Control System for SuperKEKB 2444
 
  • T. Kobayashi, K. Akai, K. Ebihara, A. Kabe, K. Nakanishi, M. Nishiwaki, J.-I. Odagiri
    KEK, Ibaraki, Japan
  • H. Deguchi, K. Hayashi, T. Iwaki, M. Ryoshi
    Mitsubishi Electric TOKKI Systems, Amagasaki, Hyogo, Japan
 
  Beam commissioning of the SuperKEKB will be started in 2015. A new LLRF control system, which is an FPGA-based digital RF feedback control system on the MicroTCA platform, has been developed to satisfy the requirement for high current beam operation of the SuperKEKB. Then final refinements were applied, and now the quantity production is in progress. As a new function, klystron phase lock loop was additionally implemented within the cavity feedback control loop in the FPGA, and it was successfully worked in the low-level operation test. For the SuperKEKB, damping ring (DR) is required for the positron injection. Therefore another new LLRF control system is under development for the DR-RF system. It is operated at the same RF-frequency as the main ring, and vector sum control of three cavities is needed in the DR-LLRF control. In this report, the development status and progress from the previous report will be presented including the RF reference distribution system.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-WEPME071  