Author: Aberle, O.
Paper Title Page
MOPRO044 Construction and Bench Testing of a Prototype Rotatable Collimator for the LHC 178
 
  • T.W. Markiewicz, E.L. Bong, L. Keller
    SLAC, Menlo Park, California, USA
  • O. Aberle, A. Bertarelli, P. Gradassi, A. Marsili, S. Redaelli, A. Rossi, B. Salvachua, G. Valentino
    CERN, Geneva, Switzerland
 
  Funding: This work partially supported by the U.S. Department of Energy through the US LHC Accelerator Research Program (LARP) and contract DE-AC02-76SF00515.
A second generation prototype rotatable collimator has been fabricated at SLAC and delivered to CERN for further vacuum, metrology, function and impedance tests. The design features two cylindrical Glidcop jaws designed to each absorb 12kW of beam in steady state and up to 60kW in transitory beam loss with no damage and minimal thermal distortion. The design is motivated by the use of a radiation resistant high Z low impedance readily available material. A vacuum rotation mechanism using the standard LHC collimation jaw positioning motor system allows each jaw to be rotated to present a new 2cm high surface to the beam if the jaw surface were to be damaged by multiple full intensity beam bunch impacts in a asynchronous beam abort. Design modifications to improve on the first generation prototype, pre-delivery functional tests performed at SLAC and post-delivery test results at CERN are presented.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-MOPRO044  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THPME069 Performance Studies of the SPS Beam Dump System for HL-LHC Beams 3394
 
  • F.M. Velotti, O. Aberle, C. Bracco, E. Carlier, F. Cerutti, K. Cornelis, L. Ducimetière, B. Goddard, V. Kain, R. Losito, C. Maglioni, M. Meddahi, F. Pasdeloup, V. Senaj, G.E. Steele
    CERN, Geneva, Switzerland
 
  The Super Proton Synchrotron (SPS) beam dump system is a concern for the planned High Luminosity LHC (HL-LHC) operation. The system has initially been designed for very different beam parameters compared to those which will reign after the completion of the LHC injectors upgrade, when the SPS will have to operate with unprecedented beam brightness. This paper describes the relevant operational and failure modes of the dump system together with the expected beam loading levels. Tracking studies are presented, considering both normal operation and failure scenarios, with particular attention on the location and level of proton losses. First FLUKA investigations and thermo-mechanical analysis of the high-energy absorber block are described  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2014-THPME069  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)