THXMH  —  Linear Colliders, Lepton Accelerators and New Acceleration Techniques   (27-May-10   08:30—10:30)

Chair: C. Zhang, IHEP Beijing, Beijing

Paper Title Page
THXMH01 Commissioning of the EMMA Non-Scaling FFAG 3593
 
  • T.R. Edgecock
    STFC/RAL, Chilton, Didcot, Oxon
 
 

EMMA is the world's first non-scaling fixed field alternating gradient accelerator and is being constructed at the STFC Daresbury Laboratory. Experience from the initial commissioning phases (from early 2010) will be reported and lessons for future machines of a similar type will be discussed. The present experimental status and future plans will also be reported.

 

slides icon

Slides

 
THXMH02 International Design Study of a Neutrino Factory 3597
 
  • J.S. Berg
    BNL, Upton, Long Island, New York
 
 

By providing an extremely intense source of neutrinos from the decays of muons in a storage ring, a Neutrino Factory will provide the opportunity for precision measurements and searches for new physics amongst neutrino interactions. An active international collaboration is addressing the many technical challenges that must be met before the design for a Neutrino Factory can be finalized. An overview of the accelerator complex and the current international R&D program will be presented, and the key technical issues will be discussed.

 

slides icon

Slides