<xml>
  <records>
    <record>
       <contributors>
          <authors>
             <author>Jin, S.</author>
             <author>Gao, J.</author>
             <author>Gong, D.J.</author>
             <author>Liu, Z.C.</author>
             <author>Sha, P.</author>
             <author>Zhai, J.Y.</author>
             <author>Zhao, T.X.</author>
             <author>Zheng, H.J.</author>
          </authors>
       </contributors>
       <titles>
          <title>
             Study on 650MHz 5-cell Prototype Cavities at IHEP
          </title>
       </titles>
		 <publisher>JACoW</publisher>
       <pub-location>Geneva, Switzerland</pub-location>
		 <isbn>978-3-95450-191-5</isbn>
		 <electronic-resource-num>10.18429/JACoW-SRF2017-TUPB032</electronic-resource-num>
		 <language>English</language>
		 <pages>448-450</pages>
       <pages>TUPB032</pages>
       <keywords>
          <keyword>ion</keyword>
          <keyword>cavity</keyword>
          <keyword>HOM</keyword>
          <keyword>SRF</keyword>
          <keyword>simulation</keyword>
       </keywords>
       <work-type>Contribution to a conference proceedings</work-type>
       <dates>
          <year>2018</year>
          <pub-dates>
             <date>2018-01</date>
          </pub-dates>
       </dates>
       <urls>
          <related-urls>
              <url>https://doi.org/10.18429/JACoW-SRF2017-TUPB032</url>
              <url>http://jacow.org/srf2017/papers/tupb032.pdf</url>
          </related-urls>
       </urls>
       <abstract>
          CEPC Pre CDR pointed that the 650 MHz 5-cell SRF cavity could be a candidate for the main ring of the single-ring pretzel scheme at the Higgs energy in 2015. Then EM design of 5-cell cavities were published later. So, the study on the fabrication of a 5-cell prototype cavity with waveguide HOM couplers were carried on at IHEP. In the paper, we will mainly report the mechanical design and fabrication progress of the 5-cell prototype. Besides, fabrication of a bare 2-cell prototype cavity was also carried on according to the further study after Pre-CDR. Challenges and possible solutions for the prototypes development will also be discussed.
       </abstract>
    </record>
  </records>
</xml>
