Paper | Title | Page |
---|---|---|
WEP45 | The first processing of capacitive-coupling coupler at room temperature in a cryomodule at STF | 587 |
| ||
We are constructing Superconducting RF Test Facility (STF) at KEK for the R&D of ILC accelerator. In the beginning of year 2007, we installed one TESLA-like 9- cell cavity and one high-gradient Low-Loss (LL) type 9- cell cavity into cryomodules at STF. For the LL 9-cell cavity, an Capacitive-Coupling (CC) input-coupler, a ballscrew tuner and other peripherals were assembled with the cavity. The assembled cavity package was installed with thermal shields and so on into a cryomodule. After the installation, we performed the first processing of Capacitive-Coupling (CC) input-coupler in a cryomodule at the room-temperature. We achieved the power of 250 kW with the pulse-width of 1.5 msec at the repetition rate of 5 pps. This presentation describes about the assembly of a CC coupler and a high-gradient LL 9-cell cavity in a clean room and the processing of the CC coupler at the room temperature in a cryomodule. |