A  B  C  D  E  F  G  H  I  J  K  L  M  N  O  P  Q  R  S  T  U  V  W  X  Y  Z  

Gabriel F.

PaperTitlePage
WEP33Realisation of a prototype superconducting CW cavity and cryomodule for energy recovery545
 
  • P. A. McIntosh, R. Bate, C. D. Beard, M. Cordwell, D. M. Dykes, S. Pattalwar, J. Strachan, E. Wooldridge
    STFC Daresbury Laboratory
  • S. Belomestnykh, M. Liepe, H. Padamsee
    Cornell University
  • A. Buechner, F. Gabriel, P. Michel
    FZR Rossendorf
  • T. Kimura, T. I. Smith
    Stanford University
  • J. Byrd, J. N. Corlett, D. Li, S. Lidia
    LBNL
 
 For Energy Recovery applications, the requirement for high-Q accelerating structures, operating in CW mode, at large beam currents, with precise phase & amplitude stability and modest accelerating gradients are all fundamental in achieving intense photon fluxes from the synchronised FEL insertion devices. Both Daresbury Laboratory and Cornell University are developing designs for advanced Energy Recovery Linac (ERL) facilities which require accelerating Linacs which meet such demanding criteria. The specification for the main ERL accelerator for both facilities dictates a modest accelerating gradient of 20 MV/m, at a Qo of better than 10^10, with a Qext of up to 10^8. A collaborative R&D program has been set-up to design and fabricate a 'proof-of- principle' cryomodule (which is well underway) that can be tested on ERLP at Daresbury and also on the Cornell ERL injector. This paper details the new cryomodule design, provides an insight to the design solutions employed and reports on the present status of the project. 
WEP81Tests of air cooled 1.3 GHz waveguide windows using a RF coupler test bench based on a resonant ring705
 
  • H. Buettig, A. Arnold, A. Buechner, F. Gabriel, P. Michel, R. Schurig, G. Staats, J. Teichert, J. Voigtlander, A. Winter
    Reserch Center Dresden-Rossendorf
 
 A new coupler test bench based on a resonant ring has been built at ELBE in Dresden-Rossendorf to run window as well as coupler tests with RF power up to 100 kW. The ring is driven by a 10 kW klystron. This test bench includes also liquid nitrogen cooling of the ceramic cold window of the RF-coupler which allows testing under almost real conditions. A special waveguide was designed to match couplers with different antenna tips. In a first step the waveguide window has been equipped with additional air-cooling and tested. The design of the test bench and the gained experience with warm window tests at the resonant ring as far as it could be collected within a short time of operation will be reported.