MOAO07

 Spallation Neutron Source Project: Commissioning Results, First Operation Experience, and Upgrade Plans 

  • A.Aleksandrov
    Oak Ridge National Laboratory, USA

The Spallation Neutron Source accelerator systems will deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector, capable of producing one-ms-long pulses at 60Hz repetition rate with 38 mA peak current, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. The 2.5MeV beam from the Front End is accelerated to 86 MeV in the Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and finally to 1 GeV in the Superconducting Linac. With the completion of beam commissioning, the accelerator complex began operation in June 2006. Commissioning results and first operation experience will be presented. A plan is being developed to increase beam power up to 3MW. Parameters, design and status of the SNS Power Upgrade Project will be presented.