| Paper | Title | Page |
|---|---|---|
| WEO13 | Strategy for Modernizing a 40-Year-Old Accelerator Control System | 6 |
|
||
|
Funding: Fermi Research Alliance Modernizing the Fermilab accelerator control system is essential to future operations of the laboratory’s accelerator complex. The existing control system has evolved over four decades and uses hardware that is no longer available and software that uses obsolete frameworks. The Accelerator Controls Operations Research Network (ACORN) Project will modernize the control system and replace end-of-life power supplies to enable future accelerator complex operations with megawatt particle beams. The project team is evaluating three design concepts, and the future deployment of artificial intelligence capabilities for accelerator operations is an important consideration. An overview of the ACORN Project will be presented, including R&D used for evaluating the conceptual designs in the context of requirements for future accelerator operations. |
||
|
|
Slides WEO13 [1.097 MB] | |
| DOI • | reference for this paper ※ doi:10.18429/JACoW-PCaPAC2022-WEO13 | |
| About • | Received ※ 03 October 2022 — Revised ※ 18 October 2022 — Accepted ※ 15 February 2023 — Issue date ※ 20 February 2023 | |
| Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |