| Title |
Page |
| The Fermilab Upgrade |
436 |
- S.D. Holmes, D.A. Edwards, R.E. Gerig, M. Harrison, M.J. Syphers
|
|
| Time-Varying Sextupole Corrections during the Tevatron Ramp |
518 |
- D.A. Herrup, B.C. Brown, R.W. Hanft, D.E. Johnson, R.P. Johnson, M. Kuchnir, M.J. Lamm, A.D. McInturff, M.J. Syphers, A.V. Tollestrup
|
|
| 1.8 TeV Tevatron Upgrade Lattices |
1364 |
- A.A. Garren, M.J. Syphers
|
|
| Review of Beam Dynamics Experiments and Issues in Large Colliders |
1414 |
- D.A. Edwards, M.J. Syphers
|
|
A 1.5 TeV Superconducting Synchrotron Design for the Fermilab Tunnel |
1821 |
- M.J. Syphers, D.A. Edwards
|
|