PAC1977 Keywords
A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Keyword: pick-up

Title Other Keywords Page
Experiments with Stochastic Cooling in the ISR betatron, coupling, kicker, stochastic cooling 1402
  • G. Carron, L. Faltin, W. Schnell, L. Thorndahl
 
Measurement of the Excitation of the Coupling Resonance Qh -Qv = O coupling, quadrupole, resonance, skew 1440
  • P.J. Bryant, P. Galbraith, J.P. Gourber, G. Guignard, K. Takikawa
 
Better Dynamic Closed Loop Control of the PSB RF Accelerating System accelerator, injection, spectrum, synchrotron 1536
  • G. Gelato, L. Magnani
 
Electronics for the Longitudinal Active Damping System for the CERN PS Booster damping, feedback, impedance, synchrotron 1695
  • B. Kriegbaum, F. Pedersen
 
KEK Beam Position Monitor System betatron, feedback, injection, timing 1736
  • S. Shibata, Z. Igarashi, H. Ishii, K. Muto
 
Simple Q-Measurement of KEK Proton Synchrotron accelerator, betatron, booster, timing 1818
  • K. Muto, Z. Igarashi, S. Shibata
 
The 50 MHz Transverse Feedback System in the CERN ISR feedback, impedance, instability, kicker 1833
  • G. Carron, S. Myers, L. Thorndahl