Paper | Title | Page |
---|---|---|
WEZAB01 | ILC Undulator Based Positron Source, Tests and Simulations | 1974 |
Funding: NSF An undulator based positron source allows generation of polarized positrons in quantities required by ILC. Here we describe the results of modeling and testing of elements for such a system. |
||
|
Slides | |
WEZAB02 | Results on CLIC Proof of Principle from CTF3 | 1979 |
The CLIC Test Facility CTF3, built at CERN by an international collaboration, aims at demonstrating the feasibility of the CLIC scheme of Multi-TeV electron-positron collider by 2010. In its final configuration CTF3 will consist of a 150 MeV drive beam linac followed by a 42 m long delay loop and an 84 m combiner ring. The installation includes a two-beam test stand and a test decelerator. The linac and delay loop have been already commissioned, while the combiner ring will be completed by the first half of 2007. High gradient testing of accelerating structures is also under way. The status of the facility, the experimental results obtained and the future plans will be presented. | ||
|
Slides | |
WEZAB03 | Main Linac Issues and Evolving Test Facilities | 1984 |
This talk will focus on ILC Main Linac issues and how they can be addressed via various existing test facilities or by those planned or under construciton. The talk will focus on ILC main linac component test facilities in the U. S. Facilities described will include Vertical test setups to test bare SCRF cavities to demonstrate maximum achievable accelerating gradient. Horzontal testing of cavities equipped with tuners and couplers and the ILC RF unit test facility at Fermilab. Test facilities existing or under construction at DESY and KEK will also be described for context. | ||
|
Slides |