Paper | Title | Page |
---|---|---|
MOYKI01 | e+e- Factories | 12 |
Funding: Work supported by USDOE contract DE-AC02-76SF00515 The achievements of the e+e- Factories have been impressive. The KEK B- Factory has achieved a peak luminosity of 1.7x1034 cm2/s and the PEP-II B-Factory has reached 1.2x1034 cm2/s while the Dafne Phi-Factory has obtained 1.5x1032 cm2/s. Early in the B-Factory running, CP violation in the B meson system was found to be consistent with the prediction of the Standard Model. Now all three factories are integrating as much luminosity as they can in order to look for rare decay channels that may have a rate that differs from the value predicted by the Standard Model and therefore hint at New Physics. I will give a status report on the most recent accomplishments of all three factories PEP-II, KEKB and Dafne and will show what the three facilities have for plans to further improve performance. |
||
|
Slides | |
MOYKI02 | Commissioning of New Synchrotron Radiation Facilities | 17 |
Several new synchrotron radiation facilities have been commissioned over the past two years, and almost every commissioning is an impressive success with a high performance level and a swift process. In this paper, an overview of the new synchrotron radiation facilities which are coming into operation, such as Diamond, SOLEIL, Australian Synchrotron and Indus-II, is presented. | ||
|
Slides | |
MOYKI03 | Energy Recovery Linacs | 22 |
Energy recovey linacs have made great strides in the past decade and are now poised to revolutionize light sources, lepton-hadron colliders, electron coolers, high-power FELs, Compton sources and THz radiators. The status and direction of ERLS will be discussed. | ||
|
Slides |