FROAKI01 |
Magnet Acceptance and Allocation at the LHC Magnet Evaluation Board
|
3739 |
|
- L. Bottura
- P. Bestmann, N. Catalan-Lasheras, S. D. Fartoukh, S. S. Gilardoni, M. Giovannozzi, J. B. Jeanneret, M. Karppinen, A. M. Lombardi, K. H. Mess, D. P. Missiaen, M. Modena, R. Ostojic, Y. Papaphilippou, P. Pugnat, S. Ramberger, S. Sanfilippo, W. Scandale, F. Schmidt, N. Siegel, A. P. Siemko, D. Tommasini, T. Tortschanoff, E. Y. Wildner
CERN, Geneva
|
|
|
The normal- and superconducting magnets for the LHC ring have been carefully examined to insure that each of the more than 1800 assemblies is suitable for the operation in the accelerator. Magnet coordinators, hardware experts and accelerator physicists, joined in the LHC Magnet Evaluation Board, have contributed to this work that consists in the magnet acceptance, and the optimisation achieved by sorting magnets according to their geometry, field quality and quench level. This paper gives a description of the magnet approval mechanism that has been running since four years, reporting in a concise summary on the main results achieved. We take as specific indicators the computed mechanical aperture, the sorting efficiency with respect to systematic and random field errors in the magnets, and the case-by-case analysis necessary to accommodate hardware limitations such as quench limits and training.
|
|
|
Slides
|
|
FROAKI02 |
LHC Magnet Tests: Operational Techniques and Empowerment for Successful Completion
|
3742 |
|
- V. Chohan
- N. Ali, P. Awale, S. Bahuguna, V. Chauhan, M. Y. Dixit, J. A. Gore, J. John, E. Kandaswamy, A. Kasbekar, P. Kashyap, C. P. Kulkarni, A. Laddha, S. Malhotra, M. Mascarenhas, J. K. Mishra, P. Motiwala, K. Nair, R. Narayanan, S. Padmakumar, A. Pagare, D. Peruppayikkad, S. Raghunathan, S. Rao, D. Roy, S. Sethumadhavan, S. Sharma, S. Shimjith, S. Singh, S. T. Sonnis, P. Surendran, A. Tikaria
BARC, Mumbai
- U. Bhunia
DAE/VECC, Calcutta
- G. H. Hemelsoet, F. Pirotte, K. Priestnall, E. Veyrunes
CERN, Geneva
- A. Kasliwal
RRCAT, Indore (M. P.)
|
|
|
The LHC magnet tests operation team* developed various innovative techniques, particularly since early 2004, to complete the superconductor magnet testing by end 2006. Overall and cryogenic priority handling, rapid on-bench thermal cycling, rule-based goodness evaluation on round-the-clock basis, multiple, mashed web systems are some of these techniques applied with rigour for successful tests completion in time. This paper highlights these operation empowerment tools which had a pivotal role for success. A priority handling method was put in place to enable maximum throughput from twelve test benches, having many different constraints. For the cryogenics infrastructure, it implied judicious allocation of limited resources to the benches. Rapid On-Bench Thermal Cycle was a key strategy to accelerate magnets tests throughput, saving time and simplifying logistics. First level magnet appraisal was developed for 24 hr decision making so as to prepare a magnet further for LHC or keep it on standby. Web based systems (Tests Management and E-Traveller) were other essential ideas to track & coordinate various stages of tests handled by different teams.
|
|
|
Slides
|
|