| Paper | Title | Page |
|---|---|---|
| TUPAN050 | Status of the Induction Acceleration System | 1502 |
|
||
|
Single proton bunch confined by the barrier voltage was accelerated by the induction step-voltage from 500 MeV to 6 GeV at the KEK-PS on March 2006*. We will present the status with the information about troubles and counter-measures for the induction acceleration system.
* K. Takayama, presented in PAC07. |