|
- P. J. Spiller
- U. B. Blell, H. Eickhoff, E. Fischer, E. Floch, P. Hulsmann, J. E. Kaugerts, M. Kauschke, H. Klingbeil, H. G. Koenig, A. Kraemer, D. Kramer, U. Laier, G. Moritz, C. Omet, N. Pyka, H. Ramakers, H. Reich-sprenger, M. Schwickert, J. Stadlmann
GSI, Darmstadt
- A. D. Kovalenko
JINR, Dubna, Moscow Region
|
|
|
The project status of the main accelerators, the SIS100 and SIS300 synchrotrons of the FAIR project will be presented. In order to accommodate more preferable technical solutions, the structure of the magnet lattice had to be modified in both machines. After these changes, more appropriate technical solutions for the main magnets and quench protection systems could be adapted. The general machine layout and design, e.g. of the demanding extraction schemes, has been detailed and open design issues were solved. The developments and design of all major technical systems are in progress and prototyping has started or is in preparation.
|
|