Paper |
Title |
Page |
MOZAKI01 |
Compensation of the Crossing Angle with Crab Cavities at KEKB
|
27 |
|
- K. Oide
- T. Abe, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, H. Koiso, Y. Kojima, K. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
KEK, Ibaraki
- E. Perevedentsev, D. N. Shatilov
BINP SB RAS, Novosibirsk
|
|
|
The crab cavities are presently being installed in the KEKB rings to compensate the crossing angle at collision and thus increase luminosity. This will be the first experience with such cavities in colliders. Results on the beam operation of the new cavities, both for single and colliding beams, will be presented including the luminosity performance and limitations.
Work presented on behalf of the KEKB Accelerator Group.
|
|
|
Slides
|
|
THICKI04 |
Development of STF Cryogenic System in KEK
|
2701 |
|
- J. Yoshida
- K. Hara, K. Hosoyama, Y. Kojima, H. Nakai, K. Nakanishi
KEK, Ibaraki
- T. Ichitani, S. Kaneda
Taiyo Nippon Sanso Corporation, Kawasaki-city Kanagawa Pref.
- T. Kanekiyo
Hitachi Technologies and Services Co., Ltd., Kandatsu, Tsuchiura
- M. Noguchi
Mayekawa MFG. Co., Ltd., Moriya
- S. Sakuma, K. Suzuki
Taiyo Nippon Sanso Higashikanto Corporation, Hitachi-shi, Ibaraki-Perf.
|
|
|
Under the leadership of KEK, the collaborating design activity has been performed in KEK in order to develop the STF (Superconducting RF Test Facility) cryogenic system, together with some positive Japanese industrial members. As the first activity of the collaboration, the initial plant of STF cryogenic system with capacity of 30W at 2.0K has been constructed for the testing of STF cryomodule, and been ready for its operation in KEK. In this session, the present status and schedule of STF cryogenic system in KEK shall be briefly reported.
|
|
|
Slides
|
|
TUPMN044 |
Status of R&D Efforts Toward the ERL-based Future Light Source in Japan
|
1016 |
|
- T. Kasuga
- T. A. Agoh, A. Enomoto, S. Fukuda, K. Furukawa, T. Furuya, K. Haga, K. Harada, S. Hiramatsu, T. Honda, K. Hosoyama, M. Izawa, E. Kako, H. Kawata, M. Kikuchi, Y. Kobayashi, M. Kuriki, T. Mitsuhashi, T. Miyajima, S. Nagahashi, T. Naito, T. Nogami, S. Noguchi, T. Obina, S. Ohsawa, M. Ono, T. Ozaki, S. Sakanaka, H. Sasaki, S. Sasaki, K. Satoh, M. Satoh, T. Shioya, T. Shishido, T. Suwada, M. Tadano, T. Takahashi, Y. Tanimoto, M. Tawada, M. Tobiyama, K. Tsuchiya, T. Uchiyama, K. Umemori, S. Yamamoto
KEK, Ibaraki
- R. Hajima, H. Iijima, N. Kikuzawa, E. J. Minehara, R. Nagai, N. Nishimori, M. Sawamura
JAEA/ERL, Ibaraki
- H. Hanaki, H. T. Tomizawa
JASRI/SPring-8, Hyogo-ken
- A. Ishii, I. Ito, H. Kudoh, N. Nakamura, H. Sakai, S. Shibuya, K. Shinoe, H. Takaki
ISSP/SRL, Chiba
- M. Katoh, A. Mochihashi, M. Shimada
UVSOR, Okazaki
|
|
|
Energy Recovery Linacs (ERL), based on superconducting accelerators, are one of the most promising synchrotron light sources in future. The KEK and the JAEA, in collaboration with the ISSP, the UVSOR, and the SPring-8, are considering to realize together the ERL-based next-generation light source in Japan. To establish key technologies for that, active R&D efforts started. The R&D program includes the developments of ultra-low-emittance photocathode guns and of superconducting cavities, as well as experimental proofs of accelerator-physics issues at the ERL test facility, which will be built at the KEK campus. We are currently working on constructing a prototype photocathode gun, on designing superconducing cavities, and on designing a prototype ERL. The current plan of the prototype ERL comprises a full injector linac, one or two cryomodules for the main linac, and the beam return loop, which can be operated at beam energies from 60 to 160 MeV. The up-to-date R&D status will be reported.
|
|
TUPAN045 |
Beam Operation with Crab Cavities at KEKB
|
1487 |
|
- H. Koiso
- T. Abe, T. A. Agoh, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Inagaki, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, Y. Kojima, I. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
KEK, Ibaraki
- E. Perevedentsev
BINP SB RAS, Novosibirsk
|
|
|
Beam operation with crab cavities is planned in early 2007 at KEKB. The crab crossing scheme is expected to increase the vertical beam-beam tune-shift parameter significantly. One crab cavity will be installed in each ring where conditions for beam optics are matched to compensate the beam crossing angle of 22 mrad. Operation results on collision tuning with the crab cavities will be presented.
For the KEKB Accelerator Group.
|
|