Paper | Title | Page |
---|---|---|
THPMN057 | New Concept for a CLIC Post-Collision Extraction Line | 2835 |
Funding: This work is supported by the Commission of the European Communities under the 6th Framework Programme "Structuring the European Research Area", with contract number RIDS-011899. Strong beam-beam effects at the interaction point of a high-energy e+e- linear collider such as CLIC lead to an emittance growth for the outgoing beams, as well as to the production of beamstrahlung photons and e+e- coherent pairs. We present a conceptual design of the post-collision line for CLIC at 3 TeV, which separates the various components of the outgoing beam in a vertical magnetic chicane and then transports them to their respective dump. |
||
THPMN058 | Beam Dynamics Studies in the CLIC Injector Linac | 2838 |
|
||
The CLIC Injector Linac has to accelerate both electron and positron main beams from 200 MeV up to 2.42 GeV prior to their injection into the pre-damping rings. Its 26 accelerating structures operate at 1.875 GHz, with a loaded gradient of 17 MV/m. A FODO lattice that wraps the accelerating structures at the beginning of the linac, followed by a succession of triplet lattices between the accelerating structures, is proposed. The large transverse emittance (9200 mm.mrad), bunch length (5 mm) and energy spread (7 MeV) of the positron beam set constraints on the linac in order to reach acceptable characteristics at 2.42 GeV for the injection into the pre-damping ring. The use of a bunch compressor at the entrance of the linac is an option in order to achieve good performance in both the longitudinal and transverse phase spaces. Tracking studies of both electron and positron beams in the linac have been performed and are presented. | ||
TUPAN095 | Design and Performance of the CNGS Secondary Beam Line | 1601 |
|
||
An intense muon-neutrino beam (1017 nu-mu/day) is generated at CERN and directed towards the Gran Sasso National Laboratory, LNGS, in Italy, 732 km away from CERN. The muon-neutrinos are produced in association with muons in the decay of the pions and kaons created in the target. In the presently approved physics programme, it is foreseen to run the CNGS facility with 4.5 · 1019 protons/year for five years. During a CNGS cycle, i.e. every 6s, two nominal SPS extractions of 2.4 ·1013 protons each at 400GeV/c are sent down the proton beam line to the target. The CNGS secondary beam line, starting with the target, has to cope with this situation, which pushes the beam line equipment and instrumentation to the limits of radiation hardness, mechanical stresses, etc. during the CNGS operation. An overview of the CNGS secondary beam line will be shown. Emphasis will be on the target, the magnetic focusing lenses (horn and reflector) and the muon monitors. The performance of the secondary beam line during beam commissioning and physics operation will be discussed and measurements compared with simulations. | ||
THPMN063 | CTF3 Combiner Ring Commissioning | 2850 |
|
||
CLIC Test Facility 3 (CTF3) has the objective to demonstrate the remaining feasibility issues of the CLIC two-beam technology for a future multi-TeV linear collider. One key issue is the efficient generation of a very high current 'drive beam' that serves as the power source for the acceleration of the main beam to high energy. This large current beam is produced by interleaving bunches in a combiner ring using transverse deflecting RF cavities. The 84 m long CTF3 combiner ring and the connecting transfer line have been recently installed and put into operation. The latest commissioning results will be presented. | ||
WEOCAB01 | Design of the Beam Delivery System for the International Linear Collider | 1985 |
|
||
The beam delivery system for the linear collider focuses beams to nanometer sizes at the interaction point, collimates the beam halo to provide acceptable background in the detector and has a provision for state-of-the art beam instrumentation in order to reach the physics goals. The beam delivery system of the International Linear Collider has undergone several configuration changes recently. This paper describes the design details and status of the baseline configuration considered for the reference design. | ||
|
Slides |