TUPAS096 | Setup and Performance of the RHIC Injector Accelerators for the 2007 Run with Gold Ions | 1862 |
|
||
Funding: Work performed under the auspices of the US Department of Energy. Gold ions for the 2007 run of the Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) are accelerated in the Tandem, Booster and AGS prior to injection into RHIC. The setup and performance of this chain of accelerators will be reviewed with a focus on improvements in the quality of beam delivered to RHIC. In particular, more uniform stripping foils between Booster and AGS, and a new bunch merging scheme in AGS promise to provide beam bunches with reduced longitudinal emittance for RHIC. |
||
WEPMS020 | Commissioning the DARHT-II Scaled Accelerator | 2373 |
|
||
The DARHT-II accelerator will produce a 2-kA, 17-MeV beam in a 1600-ns pulse when completed this summer. After exiting the accelerator, the long pulse will be sliced into four short pulses by a kicker and quadrupole septum and then transported for several meters to a tantalum target for conversion to bremsstrahlung for radiography. In order to provide early tests of the kicker, septum, transport, and multi-pulse converter target we assembled a short accelerator from the first available refurbished cells, which are now capable of operating of operating at over 200 kV. This scaled accelerator was operated at ~ 8 Mev and ~1 kA, which provides a beam with approximately the same nu/gamma as the final 17-MeV, 2-kA beam, and therefore the same beam dynamics in the downstream transport. In this presentation we will show the results of beam measurements made during the commissioning of this scaled accelerator. | ||
THOBAB02 | Commissioning the DARHT-II Scaled Accelerator Downstream Transport | 2627 |
|
||
The DARHT-II accelerator will produce a 2-kA, 17-MeV beam in a 1600-ns pulse when completed this summer. After exiting the accelerator, the long pulse is sliced into four short pulses by a kicker and quadrupole septum and then transported for several meters to a tantalum target for conversion to bremsstrahlung for radiography. We describe tests of the kicker, septum, transport, and multi-pulse converter target using a short accelerator assembled from the first available refurbished cells, which are now capable of operating of operating at over 200 kV. This scaled accelerator was operated at ~ 8 Mev and ~1 kA, which provides a beam with approximately the same nu/gamma as the final 17-MeV, 2-kA beam, and therefore the same beam dynamics in the downstream transport. The results of beam measurements made during the commissioning of this scaled accelerator downstream transport are described. | ||
|