Paper |
Title |
Page |
MOZAKI01 |
Compensation of the Crossing Angle with Crab Cavities at KEKB
|
27 |
|
- K. Oide
- T. Abe, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, H. Koiso, Y. Kojima, K. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
KEK, Ibaraki
- E. Perevedentsev, D. N. Shatilov
BINP SB RAS, Novosibirsk
|
|
|
The crab cavities are presently being installed in the KEKB rings to compensate the crossing angle at collision and thus increase luminosity. This will be the first experience with such cavities in colliders. Results on the beam operation of the new cavities, both for single and colliding beams, will be presented including the luminosity performance and limitations.
Work presented on behalf of the KEKB Accelerator Group.
|
|
|
Slides
|
|
TUPAN045 |
Beam Operation with Crab Cavities at KEKB
|
1487 |
|
- H. Koiso
- T. Abe, T. A. Agoh, K. Akai, M. Akemoto, A. Akiyama, A. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. W. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda, S. Inagaki, S. Isagawa, H. Ishii, A. Kabe, E. Kadokura, T. Kageyama, K. Kakihara, E. Kako, S. Kamada, T. Kamitani, K.-I. Kanazawa, H. Katagiri, S. Kato, T. Kawamoto, S. Kazakov, M. Kikuchi, E. Kikutani, K. Kitagawa, Y. Kojima, I. Komada, T. Kubo, K. Kudo, N. K. Kudo, K. Marutsuka, M. Masuzawa, S. Matsumoto, T. Matsumoto, S. Michizono, K. Mikawa, T. Mimashi, S. Mitsunobu, K. Mori, A. Morita, Y. Morita, H. Nakai, H. Nakajima, T. T. Nakamura, H. Nakanishi, K. Nakao, S. Ninomiya, Y. Ogawa, K. Ohmi, Y. Ohnishi, S. Ohsawa, Y. Ohsawa, N. Ohuchi, K. Oide, M. Ono, T. Ozaki, K. Saito, H. Sakai, Y. Sakamoto, M. Sato, M. Satoh, K. Shibata, T. Shidara, M. Shirai, A. Shirakawa, T. Sueno, M. Suetake, Y. Suetsugu, R. Sugahara, T. Sugimura, T. Suwada, O. Tajima, S. Takano, S. Takasaki, T. Takenaka, Y. Takeuchi, M. Tawada, M. Tejima, M. Tobiyama, N. Tokuda, S. Uehara, S. Uno, Y. Yamamoto, Y. Yano, K. Yokoyama, Ma. Yoshida, M. Yoshida, S. I. Yoshimoto, K. Yoshino
KEK, Ibaraki
- E. Perevedentsev
BINP SB RAS, Novosibirsk
|
|
|
Beam operation with crab cavities is planned in early 2007 at KEKB. The crab crossing scheme is expected to increase the vertical beam-beam tune-shift parameter significantly. One crab cavity will be installed in each ring where conditions for beam optics are matched to compensate the beam crossing angle of 22 mrad. Operation results on collision tuning with the crab cavities will be presented.
For the KEKB Accelerator Group.
|
|
TUPAS089 |
Small Angle Crab Compensation for LHC IR Upgrade
|
1853 |
|
- R. Calaga
- K. Akai, K. Ohmi, K. Oide
KEK, Ibaraki
- U. Dorda, R. Tomas, F. Zimmermann
CERN, Geneva
|
|
|
Funding: This work is partially supported by the U. S. DOE
A small angle (< 1mrad) crab scheme is an attractive option for the LHC luminosity upgrade to recover the geometric luminosity loss from the finite crossing angle, which steeply increases to unacceptable levels as the IP beta function is reduced below its nominal value. The crab compensation in the LHC can be accomplished using only two sets of deflecting rf cavities, placed in collision-free straight sections of LHC to nullify the crossing angles at IP1 & IP5. We present IR optics configurations with low-angle crab crossing, study the beam-beam performance and proton-beam emittance growth in the presence of crab compensation, lattice errors, crab RF noise sources. We also explore a 400MHz superconducting cavity design and discuss the pertinent RF challenges.
|
|