Wyles, N.G.

Paper Title Page
MPPT079 Commissioning of an APPLE-II Undulator at Daresbury Laboratory for the SRS 4051
 
  • J.A. Clarke, F.E. Hannon, D.J. Scott, B.J.A. Shepherd, N.G. Wyles
    CCLRC/DL/ASTeC, Daresbury, Warrington, Cheshire
 
  A new variable polarisation undulator of the APPLE-II type has been designed and constructed at Daresbury Laboratory. Initial magnet testing of the 56mm period device was followed by an intensive period of shimming to improve the field quality. After this was successfully completed the undulator was installed into the SRS and tests made of the effect of the device upon the electron beam. This beam commissioning was completed in a very short space of time with the beamline being given full control of the gap and phase of the magnet within a few weeks of installation. This paper summarises the measurement of the magnet and the shimming techniques employed to improve the field quality. It also describes the effect of the device upon the stored 2 GeV electron beam and the measures taken to minimise these effects during user operations.  
RPAE052 Overview of Accelerator Physics Studies and High Level Software for the Diamond Light Source 3188
 
  • R. Bartolini, A.I. Baldwin, M. Belgroune, C. Christou, V.C. Kempson, I.P.S. Martin, J.H. Rowland, B. Singh
    Diamond, Oxfordshire
  • D.J. Holder, J.K. Jones, S.L. Smith, J.A. Varley, N.G. Wyles
    CCLRC/DL/ASTeC, Daresbury, Warrington, Cheshire
 
  DIAMOND is a 3 GeV synchrotron light source under construction at Rutherford Appleton Laboratory in Oxfordshire (UK). The accelerators complex consists of a 100 MeV LINAC, a full energy booster and a 3GeV storage ring with 22 straight sections available for IDs. Installation of all three accelerators has begun, and LINAC commissioning is due to start in Spring 2005. This paper will give an overview of the accelerator physics activity to produce final layouts and prepare for the commissioning of the accelerator complex. The DIAMOND facility is expected to be operational for users in 2007