A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Witte, H.

Paper Title Page
MPPT059 Progress on the Coupling Coil for the MICE Channel 3468
 
  • M.A. Green, D. Li, S.P. Virostek, M.S. Zisman
    LBNL, Berkeley, California
  • Y. Ivanyushenkov
    CCLRC/RAL, Chilton, Didcot, Oxon
  • W. Lau, A. E. White, H. Witte, S.Q. Yang
    OXFORDphysics, Oxford, Oxon
 
  Funding: This work was supported by the Office of Science, U.S. Department of Energy under DOE contract number DE-AC03-76SF00098.

This report describes the progress on the coupling coil module for the international Muon Ionization Cooling Experiment (MICE). MICE consists of two cells of a SFOFO cooling channel that is similar to that studied in the level 2 study of a neutrino factory. The MICE RF coupling coil module consists of a superconducting solenoid, mounted around four cells of conventional 201.25 MHz closed RF cavities. This report discusses the progress that has been made on the superconducting coupling coil that is around the center of the RF coupling module. This report also describes the process one would use to cool the coupling coil using a single small 4 K cooler. The coupling magnet power system and quench protections system is also described.