MPPE056 Studies to Increase the Anti-Proton Transmission from the Target to the Debuncher Ring 3357
 
  • I. Reichel, M.S. Zisman
    LBNL, Berkeley, California
  • K. Gollwitzer, S.J. Werkema
    Fermilab, Batavia, Illinois
 
  Funding: This work was supported by the Director, Office of Science, High Energy Physics, U.S. Department of Energy under Contracts No. DE-AC03-76SF00098 and DE-AC02-76CH03000.

The AP2 beamline at Fermilab transports anti-protons from the production target to the Debuncher ring. The measured admittance of the Debuncher ring and the theoretical aperture of the line are larger than the size of the transmitted beam. Extensive tracking studies were done using the Accelerator Toolbox (AT) to understand the sources of the difference. As simulations pointed to chromatic effects being a source of problems, measurements were done to study this. Several possible remedies were studied including adding sextupoles to the line to reduce the chromatic effects.