Syratchev, I.

Paper Title Page
TPPT020 30 GHz Power Production in CTF3 1695
 
  • W. Wuensch, C. Achard, H.-H. Braun, G. Carron, R. Corsini, A. Grudiev, S.T. Heikkinen, D. Schulte, J.P.H. Sladen, I. Syratchev, F. Tecker, I. Wilson
    CERN, Geneva
 
  One of the major objectives of CTF3 (CLIC Test Facility) is the production of 30 GHz power for the high-gradient testing of CLIC accelerating structures. To this end a dedicated beam line, power generating structure and power transfer line have been designed, installed and commissioned. 52 MW of 30 GHz power with a pulse length of 74 ns and a repetition rate of 16 Hz were delivered to the high-gradient test area. This will allow operation of test accelerating structures in the coming run of CTF3 up to the nominal CLIC accelerating gradient of 150 MV/m and beyond the nominal pulse length. The system is described and the performances of the CTF3 linac, beam line and the rf components are reviewed.  
RPPP010 Considerations on the Design of the Decelerator of the CLIC Test Facility (CTF3) 1177
 
  • D. Schulte, I. Syratchev
    CERN, Geneva
 
  Funding: We acknowledge the support of the European Community-Research Infrastructure Activity under the FP6 "Structuring the European Research Area" programme (CARE, contract number RII3-CT-2003-506395).

One of the main aims of the CLIC Test Facility (CTF3) is to study the beam stability in the drive beam decelerator and to bench mark the performance against beam simulation codes. Particular challenges come from the large drive beam energy spread, the strong wakefields and potential beam losses. The development towards a decelerator design and the required instrumentation is described in this paper.