A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Steimel, J.

Paper Title Page
MOPA004 Status of Slip Stacking at Fermilab Main Injector 347
 
  • K. Seiya, T. Berenc, B. Chase, J.E. Dey, I. Kourbanis, J.A. MacLachlan, K.G. Meisner, R.J. Pasquinelli, J. Reid, C.H. Rivetta, J. Steimel
    Fermilab, Batavia, Illinois
 
  Funding: Operated by Universities Research Association, Inc. for the U.S. Department of Energy under contract DE-AC02-76CH03000.

In order to increase proton intensity on anti proton production cycle of the Main Injector we are going to use the technique of 'slip stacking' and doing machine studies. In slip stacking, one bunch train is injected at slightly lower energy and second train is at slightly higher energy. Afterwards they are aligned longitudinally and captured with one rf bucket. This longitudinal stacking process is expected to double the bunch intensity. The required intensity for anti proton production is 8·1012 protons in 84 bunches. Beam studies of the slip stacking process have started and we have already established that the stacking procedure works as expected for a low beam intensity. In order to make this stacking process usable for higher intensity beam in standard mode of operation, we are working on high intensity beam and the development of the feedback and feed forward system is under way.

 
TOPC004 Tevatron Beam Position Monitor Upgrade 410
 
  • S.A. Wolbers, B. Banerjee, B. Barker, S. Bledsoe, T. Boes, M. Bowden, G.I. Cancelo, G. Duerling, B. Forster, B. Haynes, B. Hendricks, T. Kasza, R.K. Kutschke, R. Mahlum, M.A. Martens, M. Mengel, M. Olsen, V. Pavlicek, T. Pham, L. Piccoli, J. Steimel, K. Treptow, M. Votava, R.C. Webber, B. West, D. Zhang
    Fermilab, Batavia, Illinois
 
  Funding: Operated by Universities Research Association Inc. under Contract No. DE-AC02-76CH03000 with the United States Department of Energy.

The Tevatron Beam Position Monitor (BPM) readout electronics and software have been upgraded to improve measurement precision, functionality and reliability. The original system, designed and built in the early 1980s, became inadequate for current and future operations of the Tevatron. The upgraded system consists of 960 channels of new electronics to process analog signals from 240 BPMs, new front-end software, new online and controls software, and modified applications to take advantage of the improved measurements and support the new functionality. The new system reads signals from both ends of the existing directional stripline pickups to provide simultaneous proton and antiproton position measurements. Measurements using the new system are presented that demonstrate its improved resolution and overall performance.

 
RPAT015 First Results of a Digital Beam Phase Monitor at the Tevatron 1428
 
  • J.-P. Carneiro, S. U. Hansen, A. Ibrahim, V.D. Shiltsev, J. Steimel, R.C. Webber
    Fermilab, Batavia, Illinois
 
  A digital Beam Phase Monitor has been installed on the Tevatron ring. This device will be mainly use to diagnose the energy oscillations of each of the 36 × 36 protons and antiprotons bunches as well as to study the transient beam loading. The first results obtained from the Beam Phase Monitor will be presented on the paper.  
RPAT018 Simultaneous Position Measurements of Protons and Anti-Protons in the Tevatron 1613
 
  • R.K. Kutschke, J. Steimel, R.C. Webber, S.A. Wolbers
    Fermilab, Batavia, Illinois
 
  Fermilab has embarked upon a program to upgrade the electronics of the Beam Position Monitor (BPM) system that measures the transverse position of the beams inside the Tevatron collider. The new system improves on the current system in precision, accuracy and reliability. A new feature in the upgraded system is the ability, when both protons and anti-protons are present in the Tevatron, make simultaneous measurements of the closed orbit position of both beam species. The method chosen for achieving the simultaneous measurement is an algorithm that deconvolutes the imperfect directionality of the BPM pickups from the raw measurements. This paper will discuss the algorithm, the calibration of the parameters used by the algorithm and the robustness of the algorithm. It will also present results from the upgraded system which demonstrate that the system meets the requirements set out at the start of the upgrade project.