A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Schultheiss, C.

Paper Title Page
TPAP055 Fast IR orbit feedback at RHIC 3298
 
  • C. Montag, A. Marusic, R.J. Michnoff, T. Roser, T. Satogata, C. Schultheiss
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the US Department of Energy

Mechanical low-beta triplet vibrations lead to horizontal jitter of RHIC beams at frequencies around 10 Hz. The resulting beam offsets at the interaction points are considered detrimental to RHIC luminosity performance. To stabilize beam orbits at the interaction points, installation of a fast orbit feedback is foreseen. A prototype of this system is being developed and tested. Recent results are presented.

 
TPAT093 Operations and Performance of RHIC as a Cu-Cu Collider 4281
 
  • F.C. Pilat, L. Ahrens, M. Bai, D.S. Barton, J. Beebe-Wang, M. Blaskiewicz, J.M. Brennan, D. Bruno, P. Cameron, R. Connolly, T. D'Ottavio, J. DeLong, K.A. Drees, W. Fischer, G. Ganetis, C.J. Gardner, J. Glenn, M. Harvey, T. Hayes, H.-C. Hseuh, H. Huang, P. Ingrassia, U. Iriso, R.C. Lee, V. Litvinenko, Y. Luo, W.W. MacKay, G.J. Marr, A. Marusic, R.J. Michnoff, C. Montag, J. Morris, T. Nicoletti, B. Oerter, V. Ptitsyn, T. Roser, T. Russo, J. Sandberg, T. Satogata, C. Schultheiss, S. Tepikian, R. Tomas, D. Trbojevic, N. Tsoupas, J.E. Tuozzolo, K. Vetter, A. Zaltsman, K. Zeno, S.Y. Zhang, W. Zhang
    BNL, Upton, Long Island, New York
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

The 5th year of RHIC operations, started in November 2004 and expected to last till June 2005, consists of a physics run with Cu-Cu collisions at 100 GeV/u followed by one with polarized protons at 100 GeV. We will address here overall performance of the RHIC complex used for the first time as a Cu-Cu collider, and compare it with previous operational experience with Au, PP and asymmetric d-Au collisions. We will also discuss operational improvements, such as a ?* squeeze to 85cm in the high luminosity interaction regions from the design value of 1m, system improvements and machine performance limitations, such as vacuum pressure rise, intra-beam scattering, and beam beam interaction.

 
RPAP043 Beam-Based Alignment in the RHIC eCooling Solenoids 2771
 
  • P. Cameron, I. Ben-Zvi, W.C. Dawson, J. Kewisch, V. Litvinenko, Y. Luo, W.W. MacKay, C. Montag, J. Niedziela, V. Ptitsyn, T. Satogata, C. Schultheiss, V. Yakimenko
    BNL, Upton, Long Island, New York
 
  Funding: U.S. DOE.

Accurate alignment of the electron and ion beams in the RHIC electron cooling solenoids is crucial for well-optimized cooling. Because of the greatly differing rigidities of the electron and ion beams, to achieve the specified alignment accuracy it is required that transverse magnetic fields resulting from imperfections in solenoid fabrication be down by five orders of magnitude relative to the pure solenoid fields. Shimming the solenoid field to this accuracy might be accomplished by survey techniques prior to operation with beam, or by methods of beam-based alignment. We report on the details of a method of beam-based alignment, as well as the results of preliminary measurements with the ion beam at RHIC