A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Sahni, V.C.

Paper Title Page
WOAB006 Report on Synchrotron Radiation Source Indus-2
 
  • V.C. Sahni
    CAT, Indore (M.P.)
 
  The 2.5 GeV electron SRS, Indus-2 being built at CAT, Indore (India) is now at the final installation and integration stage. The storage ring with a circumference of 172.47m, has eight super periods and eight 4.5m long straight sections of which five are meant for insertion devices. Major sub-systems like, magnets, vacuum chambers, SIP/TSP pumps, RF power system, magnet power supplies, beam diagnostics devices etc. have been fabricated indigenously and qualified. Most of the systems are now located in the ring and their final alignment is on. Barring unforeseen problems cropping up, commissioning of the system will start with Transferlin·10-3 and then the trial beam injection into the ring will commence in mid 2005.