A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Ruggiero, A.

Paper Title Page
TPPP043 ERL Based Electron-Ion Collider eRHIC 2768
 
  • V. Litvinenko, L. Ahrens, M. Bai, J. Beebe-Wang, I. Ben-Zvi, M. Blaskiewicz, J.M. Brennan, R. Calaga, X.Y. Chang, A.V. Fedotov, W. Fischer, D. Kayran, J. Kewisch, W.W. MacKay, C. Montag, B. Parker, S. Peggs, V. Ptitsyn, T. Roser, A. Ruggiero, T. Satogata, B. Surrow, S. Tepikian, D. Trbojevic, V. Yakimenko, S.Y. Zhang
    BNL, Upton, Long Island, New York
  • A. Deshpande
    Stony Brook University, Stony Brook
  • M. Farkhondeh
    MIT, Middleton, Massachusetts
 
  Funding: Work performed under Contract Number DE-AC02-98CH10886 with the auspices of the US Department of Energy.

We present the designs of a future polarized electron-hadron collider, eRHIC* based on a high current super-conducting energy-recovery linac (ERL) with energy of electrons up to 20 GeV. We plan to operate eRHIC in both dedicated (electron-hadrons only) and parallel(with the main hadron-hadron collisions) modes. The eRHIC has very large tunability range of c.m. energies while maintaining very high luminosity up to 1034 cm-2 s-1 per nucleon. Two of the most attractive features of this scheme are full spin transparency of the ERL at all operational energies and the capability to support up to four interaction points. We present two main layouts of the eRHIC, the expected beam and luminosity parameter, and discuss the potential limitation of its performance.

*http://www.agsrhichome.bnl.gov/eRHIC/, Appendix A: Linac-Ring Option.

 
FPAE050 Injector Linac for the BNL Super Neutrino Beam Project 3129
 
  • D. Raparia, J.G. Alessi, A. Ruggiero, W.-T. Weng
    BNL, Upton, Long Island, New York
 
  Funding: This work was performed under the auspices of the U.S. DOE, Contract No. DE-AC02-98H10886.

BNL plans to upgrade the AGS proton beam from the current 0.14 MW to higher than 1.0 MW and beyond for such a neutrino facility. We have examined possible upgrades to the AGS complex that would meet the requirements of the proton beam for a 1.0 MW neutrino superbeam facility. We are proposing to replace part of the existing 200 MeV linac with coupled cavity structure from 116 MeV to 400 MeV and then add additional 1.1 GeV superconducting linac to reach a final energy of 1.5 GeV for direct H- injection into the AGS. We will present possible choices for the upgrade and our choice and its design.