A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Petrov, V.

Paper Title Page
WPAT017 Commissioning of the New RF System with the HOM Damped RF Cavity 1555
 
  • G.Y. Kurkin, V.S. Arbuzov, A. Bushuev, N. Gavrilov, E.I. Gorniker, E. Kenjebulatov, M.A. Kholopov, A.A. Kondakov, Ya.G. Kruchkov, S.A. Krutikhin, I.V. Kuptsov, L.A. Mironenko, N. Mityanina, S.V. Motygin, V.N. Osipov, V. Petrov, A.M. Pilan, A.M. Popov, E. Rotov, I. Sedlyarov, A.G. Tribendis, V. Volkov
    BINP SB RAS, Novosibirsk
  • S. Mikhailov, P.W. Wallace, P. Wang
    DU/FEL, Durham, North Carolina
 
  A new 178 MHz RF system has been commissioned at Duke Storage Ring. It consists of a 140 kW tetrode transmitter, a high order modes (HOM) damped RF cavity and the necessary frequency and voltage control electronics. The cavity walls are made of copper-on-stainless steel bimetal (8 mm Cu, 7 mm SS). The cavity has a larger beam pipe opening (700 mm in diameter) in the down-stream side, which allows the HOM propagating out of the cavity and being absorbed by the ceramic loads. The design details and the commissioning results are presented in this paper.  
FPAE007 A Project of the 2.5 GeV Booster-Synchrotron in BINP 1039
 
  • V.A. Kvardakov, V. Barbashin, V. Kiselev, E.V. Kremyanskaya, E. Levichev, S.I. Mishnev, V. Petrov, A.N. Skrinsky, V.V. Smaluk, I. Zemlyansky
    BINP SB RAS, Novosibirsk
 
  A project of the 2.5 GeV booster synchrotron to provide effective injection of electron and positron beams into VEPP-2000 and VEPP-4M storage rings, and for future facilities, is developing in BINP. The beams are injected to synchrotron at 510 MeV energy from a damping ring, which is the part of the new injection facility. In this report, the synchrotron parameters are presented, the basic systems are briefly described.