WPAT051 Development of Toshiba L-Band Multi-Beam Klystron for European XFEL Project 3153
 
  • Y.H. Chin
    KEK, Ibaraki
  • S. Choroba
    DESY, Hamburg
  • M. Y. Miyake, Y. Yano
    Toshiba, Yokohama
 
  A 10MW L-band multi-beam klystron (MBK)is under develpment at Toshiba, Japan for DESY X-FEL and a future linear collider projects. The design goals are to have 10MW peak power with 65% efficiency at 1.5 ms pulse length at 10Hz repetition rates. The Toshiba MBK has six low-perveance beams operated at low voltage of 115kV (for 10MW) to enable a higher efficiency than a single-beam klystron for a similar power. The prototyp·10-0 has been built and is now under testing. At the first step, it was tested without RF and operates stably at the cathode voltage of 115KV at 1.7ms pulse length at 10Hz repetition rate with beam transmission of better than 99%. No spurious oscillation was observed. The testing is now progressed with RF on. Up to date of November 10, 2004, The output power of 10.3MW has been demonstrated at the beam voltage of 115kV with efficinecy of 68.4% at the RF pulse length of 1ms at 10Hz. The testing is under way to increase the RF pulse length to the goal value of 1.5ms. This paper summarizes the design and the testing results.