A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Meot, F.

Paper Title Page
MPPE042 6-D BEAM DYNAMICS IN AN ISOCHRONOUS FFAG RING 2693
 
  • F. Meot
    CEA/DSM/DAPNIA, Gif-sur-Yvette
  • F. Lemuet
    CERN, Geneva
  • G. Rees
    CCLRC/RAL/ASTeC, Chilton, Didcot, Oxon
 
  Funding: CEA/DAPNIA and CERN.

Numerical ray-tracing tools for 6-D tracking in FFAG accelerators have been developed. They are applied to the simulation of muon acceleration in the newly introduced isochronous type of FFAG ring designed for 16-turn, 8 to 20~GeV muon acceleration in the Neutrino Factory.