A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Li, Y.

Paper Title Page
WPAE030 Thermal Analysis of the Al Window for a New CESR-c Luminosity Monitor 2137
 
  • Y. He, D.H. Rice
    Cornell University, Laboratory for Elementary-Particle Physics, Ithaca, New York
  • Y. Li, M.A. Palmer
    Cornell University, Department of Physics, Ithaca, New York
 
  Funding: Work supported by the U.S. National Science Foundation.

A luminosity monitor using photons from radiative bhabha events at the CLEO interaction point (IP) has been installed in the Cornell Electron Storage Ring (CESR). A key vacuum and detector component is the photon window/converter whose uniformity and thickness are critical for determining the resolution of the total energy deposited in the segmented luminosity monitor. The window design must accommodate the operational requirements of the new monitor at CLEO-c beam energies of 1.5-2.5 GeV and also provide sufficient safety margin for operation at 5.3 GeV beam energies for Cornell High Energy Synchrotron Source (CHESS) running. During 5.3 GeV operation, intense stripes of synchrotron radiation from the interaction region superconducting quadrupole magnets as well as nearby bending magnets strike the window. During the course of window development, several materials and designs were evaluated. Thermal stresses were calculated using the finite element code ANSYS for various beam conditions to guide the cooling design. A window using aluminum alloy (6061-T6) was ultimately chosen to provide optimal performance for both CLEO-c and CHESS running conditions. The window has been in successful operation since September 2004.

 
RPPE044 Vacuum Modifications for the Installation of a New CESR-c Fast Luminosity Monitor 2836
 
  • Y. Li, Y. He, M.A. Palmer
    Cornell University, Department of Physics, Ithaca, New York
 
  Funding: Work supported by the National Science Foundation.

In order to improve luminosity tuning and maintenance for the CLEO-c high energy physics (HEP) program at the Cornell Electron Storage Ring (CESR), a luminosity monitor using photons from radiative Bhabha events has been installed in the CESR ring. Over 10 meters of CESR vacuum chambers near the interaction region were modified to accommodate this new device. The vacuum modifications were designed to meet two criteria. First, the new vacuum chambers had to provide sufficient horizontal and vertical aperture for photons originating from the IP over a wide range of colliding beam conditions. Secondly, the new vacuum chambers required adequate safety margins for operation at beam energies up to 5.3 GeV for Cornell High Energy Synchrotron Source running. In order to be certain that the vacuum modifications would not give rise to any localized pressure bumps, a detailed calculation of the expected vacuum pressure distribution due to synchrotron radiation flux was carried out. Careful design and planning enabled a successful installation and resumption of CESR operations in record time.

 
RPPE045 Vacuum Pumping Performance Comparison of Non-Evaporable Getter Thin Films Deposited Using Argon and Krypton as Sputtering Gases 2860
 
  • X. Liu, Y. He, Y. Li
    Cornell University, Department of Physics, Ithaca, New York
  • M.R. Adams
    Cornell University, Ithaca, New York
 
  Funding: Work Supported by the National Science Foundation.

Owing to the outstanding vacuum performance and the low secondary electron yield, non-evaporable getter (NEG) thin film deposited onto interior walls has gained widespread acceptance and has been incorporated into many accelerator vacuum system designs. The titanium-zirconium-vanadium (T-Zr-V) NEG thin films were deposited onto the interior wall of stainless steel pipes via DC magnetron sputtering method using either argon or krypton gas as sputtering gas. Vacuum pumping evaluation tests were carried out to compare vacuum pumping performances of the Ti-Zr-V NEG thin films deposited using argon or krypton. The results showed much higher initial pumping speed for the Kr-sputtered NEG film than the Ar-sputtered film, though both films have similar activation behavior. The compositions and textures of both thin films were measured to correlate to the pumping performances.

 
RPPT026 Status of a Plan for an ERL Extension to CESR 1928
 
  • G. Hoffstaetter, S.A. Belomestnykh, J.S.-H. Choi, Z. Greenwald, M. Liepe, H. Padamsee, D. Sagan, C. Song, R.M. Talman, M. Tigner
    Cornell University, Laboratory for Elementary-Particle Physics, Ithaca, New York
  • I.V. Bazarov, K.W. Smolenski
    Cornell University, Ithaca, New York
  • D.H. Bilderback, M.G. Billing, S.M. Gruner, Y. Li, C.K. Sinclair
    Cornell University, Department of Physics, Ithaca, New York
 
  Funding: Cornell University.

We describe the status of plans to build an Energy-Recovery Linac (ERL) X-ray facility at Cornell University. This 5 GeV ERL is an upgrade of the CESR ring that currently powers the Cornell High Energy Synchrotron Source (CHESS). Due to its very small electron-beam emittances, it would dramatically improve the capabilities of the light source and result in X-ray beams orders of magnitude better than any existing storage ring light source. The emittances are based upon simulations for currents that are competitive with ring-based sources. The ERL design that is presented has to allow for non-destructive transport of these small emittances. The design includes a series of X-ray beamlines for specific areas of research. As an upgrade of the existing storage ring, special attention is given to reuse of many of the existing ring components. Options of bunch compression are discussed, tolerances for emittance growth are specified, and simulations of the beam-breakup instability and methods of increasing its threshold current are shown. This planned upgrade illustrates how other existing storage rings could be upgraded as ERL light sources with vastly improved beam qualities.