MPPT003 RESOLUTIONS OF PROBLEMS THAT OCCURRED IN SPEAR3 MAGNET 838
 
  • N. Li
    SLAC, Menlo Park, California
  • F. Huang, H. Qu
    IHEP Beijing, Beijing
 
  Funding: DOE National Institutes of Health.

Few problems occurred during the SPEAR3 magnets production at IHEP, China. It was very hard to find resolution from existing knowledge of those problems. It was possible that similar problems might happen in building accelerator magnet in other institutes before, but they were not addressed in public papers. Those problems were discussed and solved by engineers from both SSRL and IHEP after conducting certain experiments. Traditionally, the magnet design and measurement data have been always well documented and addressed in the papers, but the production experiences have not been recorded adequately. It is the goal of this paper to record the problems and their resolutions during SPEAR3 magnet production, which will certainly benefit future magnet projects.

 
TPPP034 Parameters of a Super-B-Factory Design 2333
 
  • J. Seeman, Y. Cai, S. Ecklund, J.D. Fox, S.A. Heifets, N. Li, P.A. McIntosh, A. Novokhatski, M.K. Sullivan, D. Teytelman, U. Wienands
    SLAC, Menlo Park, California
  • M.E. Biagini
    INFN/LNF, Frascati (Roma)
 
  Funding: Work supported by DOE contract DE-AC02-76SF00515.

Submitted for the High Luminosity Study Group: Parameters are being studied for a high luminosity e+e- collider operating at the Upsilon 4S that would deliver a luminosity in the range of 7 to 10 x 1035/cm2/s. Particle physics studies dictate that a much higher luminosity collider is needed to answer new key physics questions. A Super-B-Factory with 20 to 100 times the performance of the present PEP-II accelerator would incorporate a higher frequency RF system, lower impedance vacuum chambers, higher power synchrotron radiation absorbers, and stronger bunch-by-bunch feedback systems. Parameter optimizations are discussed.

 
TPPP035 Performance of the PEP-II B-Factory Collider at SLAC 2369
 
  • J. Seeman, J. Browne, Y. Cai, S. Colocho, F.-J. Decker, M.H. Donald, S. Ecklund, R.A. Erickson, A.S. Fisher, J.D. Fox, S.A. Heifets, R.H. Iverson, A. Kulikov, N. Li, A. Novokhatski, M.C. Ross, P. Schuh, T.J. Smith, K.G. Sonnad, M. Stanek, M.K. Sullivan, P. Tenenbaum, D. Teytelman, J.L. Turner, D. Van Winkle, M. Weaver, U. Wienands, M. Woodley, Y.T. Yan, G. Yocky
    SLAC, Menlo Park, California
  • M.E. Biagini
    INFN/LNF, Frascati (Roma)
  • W. Kozanecki
    CEA/DSM/DAPNIA, Gif-sur-Yvette
  • C. Steier, A. Wolski
    LBNL, Berkeley, California
  • G. Wormser
    IPN, Orsay
 
  Funding: Work supported by DOE contract DE-AC02-76SF00515.

For the PEP-II Operation Staff: PEP-II is an asymmetric e+e- collider operating at the Upsilon 4S and has recently set several performance records. The luminosity has reached 9.2 x 1033/cm2/s. PEP-II has delivered an integrated luminosity of 710/pb in one day. It operates in continuous injection mode for both beams boosting the integrated luminosity. The peak positron current has reached 2.55 A in 1588 bunches. The total integrated luminosity since turn on in 1999 has reached 256/fb. This paper reviews the present performance issues of PEP-II and also the planned increase of luminosity in the near future to over 2 x 1034/cm2/s. Upgrade details and plans are discussed.