A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kobayashi, H.

Paper Title Page
TPPT062 High Power Test of the Prototype Cryomodule for ADS Superconducting Linac 3579
 
  • E. Kako, S. Noguchi, N. Ohuchi, T. Shishido, K. Tsuchiya
    KEK, Ibaraki
  • N. Akaoka, H. Kobayashi, N. Ouchi
    JAERI/LINAC, Ibaraki-ken
  • E. Chishiro, T. Hori, M. Nakata, M. Yamazaki
    JAERI, Ibaraki-ken
 
  A prototype cryomodule containing two 9-cell superconducting cavities of beta=0.725 and fo=972MHz had been constructed under the collaboration of Japan Atomic Energy Research Institute (JAERI) and High Energy Accelerator Research Organization (KEK) on the development of superconducting LINAC for Accelerator Driven System (ADS). Cool-down tests to 2.0K of the cryomodule and high power tests with a 972MHz pulsed klystron have been successfully carried out. Rf power of 350kW in a pulsed operation of 3msec and 25Hz was transferred to the nine-cell cavity through an input coupler. Accelerating gradients of about 14MV/m higher than the specification (10MV/m) were achieved in both cavities. Design and performance of the prototype cryomodule and the test results with high rf power will be reported.  
RPPE002 Installation and Radiation Maintenance Scenario for J-PARC 50 GeV Synchrotron 835
 
  • M. Yoshioka, H. Kobayashi, T. Oogoe, Y. Takeuchi, Y. Watanabe
    KEK, Ibaraki
  • Y. Kuniyasu
    MELCO SC, Tsukuba
  • H. Oki, Y. Takiyama
    ,
 
  Funding: Ministry of Education, Culture, Science and Technology, Japan

J-PARC comprises a 400 MeV linac (181 MeV at the first stage), a 3 GeV rapid-cycling synchrotron and a 50 GeV synchrotron (Main Ring), which will provide high power proton beam to the material and life science facility, the neutrino facility and the nuclear and particle physics experimental hall. The installation of the accelerator components for the Main Ring will be started on mid. 2005 and the beam commissioning is scheduled in end of 2007. This paper describes the installation scenario of the accelerator components into the main ring tunnel and the development of radiation maintenance scenario for the beam injection and ejection systems.