MPPP003 FALSE BPM READINGS AFFECTING ORBIT FEEDBACK 847
 
  • H.-S. Kang, J. Choi, M.-H. Chun, K.M. Ha, J.Y. Huang, Y.-C. Kim, E.-H. Lee, T.-Y. Lee, W.W. Lee, J.-H. Suh
    PAL, Pohang, Kyungbuk
 
  Funding: Ministry of Science and Technology, Korea.

A slow global orbit feedback (SOFB) is routinely operating in the usual user service operation at PLS. The orbit feedback uses 22 correctors in each plane which have 20-bit capability for the vertical plane and 16-bit capability for the horizontal plane, and the feedback speed is 4 seconds. The orbit stability in RMS was maintained below 1 mm in both planes for one hour and 3 mm for a 12-hour operation. The BPM chamber movement due to the change of synchrotron radiation heat load mainly limits the SOFB performance. The intensity dependence of BPM electronics is well compensated by a look-up table of BPM.

 
WPAE015 High Heat-Load Slits for the PLS Multipole Wiggler 1449
 
  • K.H. Gil, J.Y. Choi, C.W. Chung, Y.-C. Kim, H.-S. Lee
    PAL, Pohang, Kyungbuk
 
  The HFMX (High Flux Macromolecular X-ray crystallography) beamline under commissioning at Pohang Accelerator Laboratory uses beam from a multipole wiggler for MAD experiment. Two horizontal and vertical slits relevant to high heat load are installed at its front-end. In order to treat high heat load and to reduce beam scattering, the horizontal slit has two glidcop blocks with 10° of vertical inclination and its tungsten blades defining beam size are bolted on backsides of both blocks. The blocks of the slit are adjusted on fixed slides by two actuating bars, respectively. Water through channels machined along the actuating bars cool down the heat load of both blocks. The vertical slit has the same structure as the horizontal slit except its installation direction and angle of vertical inclination. The installed slits show stable operation performance and no alignment for the blocks is required by virtue of a pair of blocks translating on slides. The cooling performance of two slits is also shown to be acceptable. In this article, the details of the design and manufacture of the two slits are presented and its operation performance is reported.  
RPPE003 Operational Experience of Cooling Water Systems for Accelerator Components at PLS 850
 
  • K.R. Kim, C.W. Chung, H.S. Han, H.-G. Kim, Y.-C. Kim, I.S. Ko, B.H. Lee
    PAL, Pohang, Kyungbuk
 
  Funding: Work supported by MOST and POSCO in Republic of Korea.

The cooling water system has been utilized for absorbing heat generated by a multitude of electromagnetic power delivering networks at PLS. The separate cooling water distribution systems for the storage ring, beam transport line and linear accelerator have been operated with a different operating temperature of supplying water. All water used for heat removal from the accelerator components are deionised and filtered to provide with over 2 MO-cm specific resistance. The operating pressures and flows of input water are also controlled with flow balancing scheme at a specified range. The operating temperature of components in the accelerator is sustained as tight as below ±0.1 deg C to minimize the influence of temperature fluctuation on the beam energy and stability. Although the PLS cooling systems were initially installed with a high degree of flexibility to allow for easy maintenance, a number of system improvements have been employed to enhance operational reliability and to incorporate the newly developed operating interfaces such as EPICS accelerator control systems. The important design and operational features of PLS cooling water systems are presented as well as lessons learned from around 10-years normal operation.