A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kim, M.

Paper Title Page
RPAE046 Operational Status at the PLS: Recent Improvements and Changes 2923
 
  • E.S. Park, J. Choi, H.-S. Kang, M. Kim, E.-H. Lee, T.-Y. Lee
    PAL, Pohang, Kyungbuk
 
  PLS has been operated 10 years since 1994. A few improvements has been made to stabilize the reference orbit drifts caused by insertion devices and other sources: The control system has been upgraded to 20 bit capability from 12 bit. The slow global orbit feedback is employed routinely in the user run times. These improvements and the operational status changes will be presented in this report.