A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kazakevich, G.M.

Paper Title Page
TPAE048 The UCLA/FNPL Time Resolved Underdense Plasma Lens Experiment 3013
 
  • M.C. Thompson, H. Badakov, J.B. Rosenzweig, G. Travish
    UCLA, Los Angeles, California
  • H. Edwards, R.P. Fliller, G.M. Kazakevich, P. Piot, J.K. Santucci
    Fermilab, Batavia, Illinois
  • J.L. Li, R. Tikhoplav
    Rochester University, Rochester, New York
 
  Funding: Work Supported by U.S. Dept. of Energy grant DE-FG03-92ER40693.

An underdense plasma lens experiment is planned as a collaboration between UCLA and the Fermilab NICADD Photoinjector Laboratory (FNPL). The experiment will focus on measuring the variation of the plasma focusing along the longitudinal beam axis and comparing these results with theory and simulation. The experiment will utilize a thin gaussian underdense plasma lens with peak density 6 x 1012 cm-3 and a FWHM length of 1.6 cm. This plasma lens will have a focusing strength equivalent to a quadrupole magnet with a 180 T/m field gradient. A 15 MeV, 8nC electron beam with nominal dimensions sr = 400 μm and sz = 2.1 mm will be focused by this plasma lens onto an OTR screen approximately 2 cm downstream of the lens. The light from the OTR screen will be imaged into a streak camera in order to directly measure the correlation between z and sr within the beam. Status and progress on the experiment are reported.

 
ROPC006 Commissioning of Fermilab's Electron Cooling System for 8-GeV Antiprotons 540
 
  • S. Nagaitsev, D.R. Broemmelsiek, A.V. Burov, K. Carlson, C. Gattuso, M. Hu, B.J. Kramper, T.K. Kroc, J.R. Leibfritz, L.R. Prost, S.M. Pruss, G.W. Saewert, C.W. Schmidt, A.V. Shemyakin, M. Sutherland, V. Tupikov, A. Warner
    Fermilab, Batavia, Illinois
  • W. Gai
    ANL, Argonne, Illinois
  • G.M. Kazakevich
    BINP SB RAS, Novosibirsk
  • S. Seletsky
    Rochester University, Rochester, New York
 
  A 4.3-MeV electron cooling system has been installed at Fermilab in the Recycler antiproton storage ring and is being currently commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper will report on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.