A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Jin, K.

Paper Title Page
WPAT065 HLS RF System Improvement in NSRL Phase II Project 3653
 
  • K. Jin, Y. An, L. Feng, G. Huang, G. Liu, G. Wang, X. Zeng
    USTC/NSRL, Hefei, Anhui
 
  Hefei Light Source (HLS) is mainly composed of an 800 MeV electron storage ring and a 200 MeV Linac functioning as its injector. The RF system has been improved successfully for HLS storage-ring in NSRL Phase II Project. In this paper, the improvement of generator and power transmission system, the development of a new RF cavity and the perfection of RF controls are described in detail. The results and some analyses are presented.  
RPPT045 A Method to Calibrate Beam Position Monitor at HLS 200 MeV LINAC 2896
 
  • J.-H. Li, Y. Cao, H. He, K. Jin, P. Lu, B. Sun, J. P. Wang, Y. Wang, P. Zheng
    USTC/NSRL, Hefei, Anhui
 
  In order to improve injection efficiency of HLS 200Mev LINAC, we redesign a new strip line beam position monitor system, which is consisted of a strip line structure and a signal processing system. We decide on an online calibration method based on beam to find out the geometry centre displacement and relative gain offset. Before the BPM testing bench has been prepared, we make a simulation based on the model accounted for all factors influencing signal amplitudes and get the calibrating results. At last, we analyze the nonlinearity effect on the calibration results.