A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Holik, P.S.

Paper Title Page
RPPE011 SNS AC Power Distribution and Reliability of AC Power Supply 1231
 
  • P.S. Holik
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.

The SNS Project has 45MW of installed power. A design description under the Construction Design and Maintenance (CDM) with regard to regulations (OSHA, NFPA, NEC), reliability issues and maintenance of the AC power distribution system are herewith presented. The SNS Project has 45MW of installed power. The Accelerator Systems are Front End (FE)and LINAC KLYSTRON Building (LK), Central Helium Liquefier (CHL), High Energy Beam Transport (HEBT), Accumulator Ring and Ring to Target Beam Transport (RTBT) Support Buildings have 30MW installed power. FELK has 16MW installed, majority of which is klystron and magnet power supply system. CHL, supporting the super conducting portion of the accelerator has 7MW installed power and the RING Systems (HEBT, RING and RTBT) have also 7MW installed power.*

*SNS SRD. KJ Basis of Design. IEEE Red Book. IEEE Gold Book. IEEE Green Book. NEC NFPA.

 
RPPE012 Grounding of SNS Accelerator Structure 1278
 
  • P.S. Holik
    ORNL, Oak Ridge, Tennessee
 
  Funding: UT-Battelle, SNS Collaboration.

Description of site general grounding network. RF grounding network enhancement underneath the klystron gallery building. Grounding network of the Ring Systems with ground breaks in the Ring Tunnel. Grounding and Bonding of R&D accelerator equipment. SNS Building lightning protection.

*SNS SRD *IEEE GREEN BOOK *IEEE EMERALD BOOK