WPAE069 The APS Septum Magnet Power Supplies Upgrade 3795
 
  • B. Deriy, A.L. Hillman, G.S. Sprau, J. Wang
    ANL, Argonne, Illinois
 
  Funding: Work supported by U.S. Department of Energy, Office of Basic Energy Sciences, under Contract No. W-31-109-ENG-38.

The higher requirements for beam injection stability at the APS storage ring demand improvement of pulsed power supplies for the septum magnets. The upgrade will be performed in two stages. In the first stage we will implement a new power supply circuit with a new regulation timing sequence that will provide better voltage regulation performance. A common design was made for all of the septum magnet power supplies at the APS. The new regulation module has already been tested on both thin and thick septum magnet power supplies. This test showed that the new target for the current regulation stability, 1/2000 with less than 10-ns jitter, is achievable with this approach. In the second stage we will implement an embedded microprocessor system that will provide digitally controlled shot-to-shot current regulation of the power supply. The system comprises modules for communication with EPICS, data acquisition, and precise timing. A prototype has already been built and will also be discussed.

 
WPAE070 Injector Power Supplies Reliability Improvements at the Advanced Photon Source 3804
 
  • A.L. Hillman, S.J. Pasky, N. Sereno, R. Soliday, J. Wang
    ANL, Argonne, Illinois
 
  Funding: *Work supported by U.S. Department of Energy, Office of Basic Energy Sciences, under Contract No. W-31-109-ENG-38.

Operational goals for the APS facility include 97% availability and a mean time between unscheduled beam losses (faults) of 70 hours, with more than 5000 user hours of scheduled beam per year. To meet this objective, our focus has changed to maximizing the mean time between faults (MTBF). We have made various hardware and software improvements to better operate and monitor the injector power supply systems. These improvements have been challenging to design and implement in light of the facility operating requirements but are critical to maintaining maximum reliability and availability of beam for user operations. This paper presents actions taken as well as future plans to continue improving injector power supply hardware and software to meet APS user operation goals.