A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Grames, J.M.

Paper Title Page
TPPP015 ELIC at CEBAF 1437
 
  • Y.S. Derbenev, S.A. Bogacz, J.R. Delayen, J.M. Grames, A. Hutton, G.A. Krafft, R. Li, L. Merminga, M. Poelker, B.C. Yunn, Y. Zhang
    Jefferson Lab, Newport News, Virginia
  • C. Montag
    BNL, Upton, Long Island, New York
 
  Funding: Work supported by DOE Contract DE-AC05-84ER40150.

We report on the progress of the conceptual development of the energy recovering linac (ERL)-based Electron-Light Ion Collider (ELIC) at CEBAF that is envisioned to reach luminosity level of 1033-1035 /cm2s with both beams polarized to perform a new class of experiments in fundamental nuclear physics. Four interaction points with all light ion species longitudinally or transversally polarized and fast flipping of the spin for all beams are planned. The unusually high luminosity concept is based on the use of the ERL and circulator ring-based electron cooling and crab crossing colliding beams. Our recent studies concentrate on the design of low beta interaction points with crab-crossing colliding beams, the exploration on raising the polarized electron injector current to the level of 3-30 mA with the use of electron circulator-collider ring, forming a concept of stacking and cooling of the ion beams, specifications of the electron cooling facility, and studies of beam-beam interaction and intra-beam scattering.

 
TPPP016 Beam Physics for the 12 GeV CEBAF Upgrade Project 1482
 
  • L. Merminga, J. F. Benesch, S.A. Bogacz, Y.-C. Chao, A. Freyberger, J.M. Grames, L. Harwood, R. Kazimi, G.A. Krafft, M. Spata, M. Tiefenback, M. Wiseman, B.C. Yunn, Y. Zhang
    Jefferson Lab, Newport News, Virginia
 
  Funding: Work supported by DOE Contract DE-AC05-84ER40150.

Beam physics aspects of the 12 GeV Upgrade of CEBAF are presented. The CEBAF Upgrade to 12 GeV is achieved via 5.5 recirculations through the linacs, and the installation of 10 new high-gradient cryomodules. A new experimental hall, Hall D, is envisioned at the end of North Linac. Simulation results for straight-through and recirculated injectors are summarized and compared. Beam transport designs are discussed and evaluated with respect to matching and beam breakup (BBU) optimization. Effects of synchrotron radiation excitation on the beam properties are calculated. BBU simulations and derived specifications for the damping of higher order modes of the new 7-cell cavities are presented. The energies that provide longitudinal polarization in multiple experimental halls simultaneously are calculated. Finally, a detailed optics design for the Hall D transport line has been obtained.

 
WPAP045 Ion Back-Bombardment of GaAs Photocathodes Inside DC High Voltage Electron Guns 2875
 
  • J.M. Grames, P. Adderley, J. Brittian, D. Charles, J. Clark, J. Hansknecht, M. Poelker, M.L. Stutzman, K.E.L. Surles-Law
    Jefferson Lab, Newport News, Virginia
 
  Funding: This work was supported by U.S. DOE Contract No. DE-ACO5-84-ER40150.

The primary limitation for sustained high quantum efficiency operation of GaAs photocathodes inside DC high voltage electron guns is ion back-bombardment of the photocathode. This process results from ionization of residual gas within the cathode/anode gap by the extracted electron beam, which is subsequently accelerated backwards to the photocathode. The damage mechanism is believed to be either destruction of the negative electron affinity condition at the surface of the photocathode or damage to the crystal structure by implantation of the bombarding ions. This work characterizes ion formation within the anode/cathode gap for gas species typical of UHV vacuum chambers (i.e., hydrogen, carbon monoxide and methane). Calculations and simulations are performed to determine the ion trajectories and stopping distance within the photocathode material. The results of the simulations are compared with test results obtained using a 100 keV DC high voltage GaAs photoemission gun and beamline at currents up to 10 mA DC.

 
WPAP046 Injection Options for 12 GeV CEBAF Upgrade 2911
 
  • R. Kazimi, J. F. Benesch, Y.-C. Chao, J.M. Grames, G.A. Krafft, M. Tiefenback, B.C. Yunn, Y. Zhang
    Jefferson Lab, Newport News, Virginia
 
  Funding: Work supported by DOE Contract DE-AC05-84ER40150.

Jefferson Lab is planning to upgrade the CEBAF accelerator from 6 to 12 GeV. In order to achieve this, the beam energy at injection into the main accelerator needs to increase from 67 MeV to either 123 or 134 MeV depending on the location of the new experimental hall relative to the accelerator. The present 100 keV electron source and beam formation to 5 MeV will remain unchanged; however, the present accelerating cryomodules in the injector cannot reach the higher injection energies. Consequently, two options for attaining these energies are considered: (1) replacing the present injector cryomodules with new, higher gradient cryomodules, or (2) re-circulating the beam through the existing cryomodules to achieve the necessary energy gain in two passes. In this paper we present simulation results and list the advantages and disadvantages of these two options.