WPAE037 Deformation Monitoring of the Spallation Neutron Source (SNS) Tunnels 2509
 
  • J.J. Error, D.R. Bruce, J.J. Fazekas, S.A. Helus, J.R. Maines
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.

The SNS Project is a 1.4 MW accelerator-based neutron source located at Oak Ridge National Laboratory in Oak Ridge, Tennessee. For shielding purposes, a 17 foot berm of native soil has been constructed on top of the accelerator tunnel system. This backfill has caused ongoing settlement of the tunnels. The settlement has been monitored by the SNS Survey and Alignment Group at regular intervals, in order to discover the patterns of deformation, and to determine when the tunnels will be stable enough for precise alignment of beam line components. The latest monitoring results indicate that the settlement rate has significantly decreased. This paper discusses the techniques and instrumentation of the monitoring surveys, and provides an analysis of the results.

 
WPAE039 Optical Tooling and its Uses at the Spallation Neutron Source (SNS) 2577
 
  • S.A. Helus, D.R. Bruce, J.J. Error, J.J. Fazekas, J.R. Maines
    ORNL, Oak Ridge, Tennessee
 
  Funding: SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy.

Optical tooling has been a mainstay of the accelerator alignment community for decades. Even now in the age of electronic survey equipment, optical tooling remains a viable alternative, and at times the only alternative. At SNS, we combine traditional optical tooling alignment methods, instrumentation, and techniques, with the more modern electronic techniques. This paper deals with the integration of optical tooling into the electronic survey world.

 
RPPT069 The Installation Status of the SNS Accumulator Ring 3789
 
  • M.P. Hechler, R.I. Cutler, J.J. Error
    ORNL, Oak Ridge, Tennessee
  • W.J. McGahern
    BNL, Upton, Long Island, New York
 
  The Spallation Neutron Source (SNS*) SNS accumulator Ring, when completed in 2006, will be capable of delivering a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron production. This paper presents an overview of the issues and logistics associated with the preparation and installation of the accumulator Ring. The preparatory activities which occurred at the Brookhaven National Laboratory, vendors and at the SNS will be discussed as well as the installation sequence and procedures.

SNS is managed by UT-Battelle, LLC, under contract DE-AC05-00OR22725 for the U.S. Department of Energy. SNS is a partnership of six national laboratories: Argonne, Brookhaven, Jefferson, Lawrence Berkeley, Los Alamos and Oak Ridge.