A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Edwards, R.L.

Paper Title Page
TOPA009 Photonic Band Gap Accelerator Demonstration at Ku-Band. 656
 
  • E.I. Smirnova, L.M. Earley, R.L. Edwards
    LANL, Los Alamos, New Mexico
  • A.S. Kesar, I. Mastovsky, M.A. Shapiro, R.J. Temkin
    MIT/PSFC, Cambridge, Massachusetts
 
  Funding: The research is supported by DOE High Energy Physics, Contract No. DE-FG02-91ER40648.

We report progress on the design and cold test of a metal Ku-band PBG accelerator structure. The 17.140 GHz 6-cell PBG accelerator structure with reduced long-range wakefields was designed for the experiment. The copper structure was electroformed and cold-tested. Tuning was performed through chemical etching of the rods. Final cold test measurements were found to be in very good agreement with the design. The structure will be installed on the beam line at the accelerator laboratory at Massachusetts Institute of Technology and will be powered with 3 MW of peak power from the Haimson 17.14 GHz klystron. Results of the design, fabrication, cold test and hot test on the Haimson accelerator will be presented.