Ducimetière, L.

Paper Title Page
TPAP010 Reliability Analysis of the LHC Beam Dumping System 1201
 
  • R. Filippini, E. Carlier, L. Ducimetière, B. Goddard, J.A. Uythoven
    CERN, Geneva
 
  The design of the LHC Beam Dumping System is aimed at ensuring a safe beam extraction and deposition under all circumstances. The system adopts redundancy and continuous surveillance for most of its parts. Extensive diagnostics after each beam dumping action will be performed to reduce the risk of a faulty operation at the subsequent dump trigger. Calculations of the system’s safety and availability are presented, considering the detailed design of the trigger generation system and the power converters of the beam dumping kickers and septa magnets.  
WPAE058 High Voltage Measurements on Nine PFNs for the LHC Injection Kicker Systems 3402
 
  • M.J. Barnes, G.D. Wait
    TRIUMF, Vancouver
  • L. Ducimetière
    CERN, Geneva
 
  Funding: National Research Council of Canada

Each of the two LHC injection kicker magnet systems must produce a kick of 1.3 T.m with a flattop duration variable up to 7.86 microseconds, and rise and fall times of less than 900 ns and 3 microseconds, respectively. A kicker magnet system consists of four 5 Ohm transmission line magnets with matching terminating resistors, four 5 Ohm Pulse Forming Networks (PFN) and two Resonant Charging Power Supplies (RCPS). Nine PFNs, together with associated switch tanks, and dump switch terminating resistors have been built at TRIUMF and all have been tested at high voltage (54 kV) to ensure that the performance is within specification. This paper describes the HV measurements, compares these results with low voltage measurements and analyses the pulse performance of the PFNs. The measurements are compared with results from PSpice simulations and small discrepancies between the predictions and measurements are explained.

 
ROAB002 Advances of Transmission Line Kicker Magnets 235
 
  • L. Ducimetière
    CERN, Geneva
 
  Fast pulsed magnets or kickers are widely used in circular accelerators for injection, fast extraction and beam excitation. As from the early 60’s transmission line type kicker magnets have been employed to produce rectangular field pulses with good rise time. Over some 40 years this technology has evolved with the rising requirements. Whilst the necessary kick strength has increased with the particle beam energies the strive for efficiency has pushed developments towards lower impedance systems and/or short circuited magnets. The flat top ripple is constrained by the maximally tolerable beam oscillation. The beam intensity can impose a screening of the magnet yoke. The most advanced features implemented in recent transmission line kicker magnets are reviewed and illustrated with examples from different laboratories. Ongoing and potential future developments are briefly discussed.  
ROAB007 Pulsed Power Applications in High Intensity Proton Rings 568
 
  • W. Zhang, J. Sandberg
    BNL, Upton, Long Island, New York
  • R.I. Cutler
    ORNL, Oak Ridge, Tennessee
  • L. Ducimetière, T. Fowler, V. Mertens
    CERN, Geneva
  • T. Kawakubo, Y. Shirakabe
    KEK, Ibaraki
 
  Funding: Work performed under the auspices of the U.S. Department of Energy.

The pulsed power technology has been applied in particle accelerators and storage rings for over four decades. It is most commonly used in injection, extraction, beam manipulation, source, and focusing systems. These systems belong to the class of repetitive pulsed power. In this presentation, we review and discuss the history, present status, and future challenge of pulsed power applications in high intensity proton accelerators and storage rings.

 
FPAT021 Experience with Kicker Beam Coupling Reduction Techniques 1742
 
  • E.H.R. Gaxiola, J. Bertin, F. Caspers, L. Ducimetière, T. Kroyer
    CERN, Geneva
 
  SPS beam impedance is still one of the worries for operation with nominal LHC beam over longer periods once the final configuration will be installed in 2006. Several CERN SPS kickers suffer from significant beam induced ferrite heating. In specific cases, for instance beam scrubbing, the temperature of certain ferrite yokes went beyond the Curie point. Several retrofit impedance reduction techniques have been investigated theoretically and with practical tests. We report on experience gained during the 2004 SPS operation with restively coated ceramic inserts in terms of kicker heating, pulse rise time, operating voltage, and vacuum behavior. For another technique using interleaved metallic strips we observed significant improvements in bench measurements. Advantages and drawbacks of both methods and potential combinations of them are discussed and simulation as well as measured data are shown. Prospects for further improvements beyond 2006 are briefly outlined.